Construction Industry Survey (48/49)
1 tables and 132 items from the KOSIS survey “Construction Industry Survey”, as annual figures and charts.
공사지역/공사종류별 계약액,기성액,미기성액(해외건설)
Back to top공사종류별 총계 · 공사지역별 총계
- Value of orders received in original contract
- Building construction Value of orders received in original contract
- Detached & tenement house Value of orders received in original contract
- Apartment Value of orders received in original contract
- Residential shop Value of orders received in original contract
- Market department store Value of orders received in original contract
- Business building Value of orders received in original contract
- Public building Value of orders received in original contract
- Hotel & lodgings Value of orders received in original contract
- Educational facilities Value of orders received in original contract
- Hospital Value of orders received in original contract
- Public & Performance Value of orders received in original contract
- Stadium & playground Value of orders received in original contract
- Exhibition pavilion Value of orders received in original contract
- Factory & workshop Value of orders received in original contract
- Machine installation (except plant) Value of orders received in original contract
- Substation power plant Value of orders received in original contract
- Warehouse garage terminal building Value of orders received in original contract
- Hazardous property storehouse Value of orders received in original contract
- Other Building Facilities Value of orders received in original contract
- Civil engineering Value of orders received in original contract
- General road Value of orders received in original contract
- Value of construction completed
- Building construction Value of construction completed
- Detached & tenement house Value of construction completed
- Apartment Value of construction completed
- Residential shop Value of construction completed
- Market department store Value of construction completed
- Business building Value of construction completed
- Public building Value of construction completed
- Hotel & lodgings Value of construction completed
- Educational facilities Value of construction completed
- Hospital Value of construction completed
- Traditional style & Cultural building Value of construction completed
- Public & Performance Value of construction completed
- Stadium & playground Value of construction completed
- Exhibition pavilion Value of construction completed
- Factory & workshop Value of construction completed
- Machine installation (except plant) Value of construction completed
- Substation power plant Value of construction completed
- Warehouse garage terminal building Value of construction completed
- Hazardous property storehouse Value of construction completed
- Other Building Facilities Value of construction completed
- Civil engineering Value of construction completed
- General road Value of construction completed
- Value of construction completed in original contract
- Building construction Value of construction completed in original contract
- Detached & tenement house Value of construction completed in original contract
- Apartment Value of construction completed in original contract
- Residential shop Value of construction completed in original contract
- Market department store Value of construction completed in original contract
- Business building Value of construction completed in original contract
- Public building Value of construction completed in original contract
- Hotel & lodgings Value of construction completed in original contract
- Educational facilities Value of construction completed in original contract
- Hospital Value of construction completed in original contract
- Public & Performance Value of construction completed in original contract
- Stadium & playground Value of construction completed in original contract
- Exhibition pavilion Value of construction completed in original contract
- Factory & workshop Value of construction completed in original contract
- Machine installation (except plant) Value of construction completed in original contract
- Substation power plant Value of construction completed in original contract
- Warehouse garage terminal building Value of construction completed in original contract
- Hazardous property storehouse Value of construction completed in original contract
- Other Building Facilities Value of construction completed in original contract
- Civil engineering Value of construction completed in original contract
- General road Value of construction completed in original contract
- Value of construction completed in subcontract
- Building construction Value of construction completed in subcontract
- Detached & tenement house Value of construction completed in subcontract
- Apartment Value of construction completed in subcontract
- Residential shop Value of construction completed in subcontract
- Market department store Value of construction completed in subcontract
- Business building Value of construction completed in subcontract
- Public building Value of construction completed in subcontract
- Hotel & lodgings Value of construction completed in subcontract
- Educational facilities Value of construction completed in subcontract
- Hospital Value of construction completed in subcontract
- Stadium & playground Value of construction completed in subcontract
- Exhibition pavilion Value of construction completed in subcontract
- Factory & workshop Value of construction completed in subcontract
- Machine installation (except plant) Value of construction completed in subcontract
- Substation power plant Value of construction completed in subcontract
- Warehouse garage terminal building Value of construction completed in subcontract
- Other Building Facilities Value of construction completed in subcontract
- Civil engineering Value of construction completed in subcontract
- General road Value of construction completed in subcontract
- Value of carry-over work
- Building construction Value of carry-over work
- Detached & tenement house Value of carry-over work
- Apartment Value of carry-over work
- Residential shop Value of carry-over work
- Market department store Value of carry-over work
- Business building Value of carry-over work
- Public building Value of carry-over work
- Hotel & lodgings Value of carry-over work
- Educational facilities Value of carry-over work
- Hospital Value of carry-over work
- Church & temple Value of carry-over work
- Public & Performance Value of carry-over work
- Stadium & playground Value of carry-over work
- Exhibition pavilion Value of carry-over work
- Factory & workshop Value of carry-over work
- Machine installation (except plant) Value of carry-over work
- Substation power plant Value of carry-over work
- Warehouse garage terminal building Value of carry-over work
- Hazardous property storehouse Value of carry-over work
- Other Building Facilities Value of carry-over work
- Civil engineering Value of carry-over work
- General road Value of carry-over work
- Value of orders received
- Building construction Value of orders received
- Detached & tenement house Value of orders received
- Apartment Value of orders received
- Residential shop Value of orders received
- Market department store Value of orders received
- Business building Value of orders received
- Public building Value of orders received
- Hotel & lodgings Value of orders received
- Educational facilities Value of orders received
- Hospital Value of orders received
- Public & Performance Value of orders received
- Stadium & playground Value of orders received
- Exhibition pavilion Value of orders received
- Factory & workshop Value of orders received
- Machine installation (except plant) Value of orders received
- Substation power plant Value of orders received
- Warehouse garage terminal building Value of orders received
- Hazardous property storehouse Value of orders received
- Other Building Facilities Value of orders received
- Civil engineering Value of orders received
- General road Value of orders received
Value of orders received in original contract
2008 48,901,833Mill. Won→2024 41,918,880Mill. Won▼ −14.3%
Building construction Value of orders received in original contract
2008 8,866,956Mill. Won→2024 5,130,317Mill. Won▼ −42.1%
Detached & tenement house Value of orders received in original contract
2008 245,093Mill. Won→2024 5,338Mill. Won▼ −97.8%
Apartment Value of orders received in original contract
2008 1,564,906Mill. Won→2024 132,213Mill. Won▼ −91.6%
Residential shop Value of orders received in original contract
2008 1,484,183Mill. Won→2024 115,056Mill. Won▼ −92.2%
Market department store Value of orders received in original contract
2008 161,860Mill. Won→2024 323,709Mill. Won▲ +100.0%
Business building Value of orders received in original contract
2008 687,132Mill. Won→2024 70,276Mill. Won▼ −89.8%
Public building Value of orders received in original contract
2008 34,481Mill. Won→2024 54,637Mill. Won▲ +58.5%
Hotel & lodgings Value of orders received in original contract
2008 644,419Mill. Won→2024 575,774Mill. Won▼ −10.7%
Educational facilities Value of orders received in original contract
2008 378,330Mill. Won→2024 3,563Mill. Won▼ −99.1%
Hospital Value of orders received in original contract
2008 363,888Mill. Won→2024 77,799Mill. Won▼ −78.6%
Public & Performance Value of orders received in original contract
2008 402Mill. Won→2023 11Mill. Won▼ −97.3%
Stadium & playground Value of orders received in original contract
2008 570Mill. Won→2024 19,862Mill. Won▲ +3384.6%
Exhibition pavilion Value of orders received in original contract
2008 306,141Mill. Won→2024 13,774Mill. Won▼ −95.5%
Factory & workshop Value of orders received in original contract
2008 1,327,882Mill. Won→2024 3,622,204Mill. Won▲ +172.8%
Machine installation (except plant) Value of orders received in original contract
2008 35,521Mill. Won→2024 334Mill. Won▼ −99.1%
Substation power plant Value of orders received in original contract
2008 246,757Mill. Won→2024 88,818Mill. Won▼ −64.0%
Warehouse garage terminal building Value of orders received in original contract
2008 138,383Mill. Won→2024 2,960Mill. Won▼ −97.9%
Hazardous property storehouse Value of orders received in original contract
2008 5,548Mill. Won→2023 8,354Mill. Won▲ +50.6%
Other Building Facilities Value of orders received in original contract
2008 1,240,505Mill. Won→2024 9,763Mill. Won▼ −99.2%
Civil engineering Value of orders received in original contract
2008 13,342,045Mill. Won→2024 2,732,785Mill. Won▼ −79.5%
General road Value of orders received in original contract
2008 1,336,104Mill. Won→2024 50,433Mill. Won▼ −96.2%
Value of construction completed
2008 32,695,270Million Won→2024 48,020,339Million Won▲ +46.9%
Building construction Value of construction completed
2008 7,051,808Million Won→2024 17,936,096Million Won▲ +154.3%
Detached & tenement house Value of construction completed
2008 85,388Million Won→2024 4,993Million Won▼ −94.2%
Apartment Value of construction completed
2008 489,321Million Won→2024 232,792Million Won▼ −52.4%
Residential shop Value of construction completed
2008 321,334Million Won→2024 249,680Million Won▼ −22.3%
Market department store Value of construction completed
2008 356,704Million Won→2024 36,363Million Won▼ −89.8%
Business building Value of construction completed
2008 576,146Million Won→2024 873,595Million Won▲ +51.6%
Public building Value of construction completed
2008 55,142Million Won→2024 44,192Million Won▼ −19.9%
Hotel & lodgings Value of construction completed
2008 654,478Million Won→2024 277,811Million Won▼ −57.6%
Educational facilities Value of construction completed
2008 122,767Million Won→2024 102,649Million Won▼ −16.4%
Hospital Value of construction completed
2008 65,887Million Won→2024 292,692Million Won▲ +344.2%
Traditional style & Cultural building Value of construction completed
2008 628Million Won→2024 11,967Million Won▲ +1805.6%
Public & Performance Value of construction completed
2008 22,986Million Won→2023 11Million Won▼ −100.0%
Stadium & playground Value of construction completed
2008 1,764Million Won→2024 81,391Million Won▲ +4514.0%
Exhibition pavilion Value of construction completed
2008 113,052Million Won→2024 30,880Million Won▼ −72.7%
Factory & workshop Value of construction completed
2008 2,051,125Million Won→2024 15,077,797Million Won▲ +635.1%
Machine installation (except plant) Value of construction completed
2008 27,889Million Won→2024 348Million Won▼ −98.8%
Substation power plant Value of construction completed
2008 620,337Million Won→2024 54,024Million Won▼ −91.3%
Warehouse garage terminal building Value of construction completed
2008 456,622Million Won→2024 557,428Million Won▲ +22.1%
Hazardous property storehouse Value of construction completed
2008 68Million Won→2019 4,524Million Won▲ +6552.9%
Other Building Facilities Value of construction completed
2008 1,030,003Million Won→2024 7,438Million Won▼ −99.3%
Civil engineering Value of construction completed
2008 6,954,385Million Won→2024 7,664,555Million Won▲ +10.2%
General road Value of construction completed
2008 594,716Million Won→2024 675,077Million Won▲ +13.5%
Value of construction completed in original contract
2008 30,812,986Million Won→2024 44,307,351Million Won▲ +43.8%
Building construction Value of construction completed in original contract
2008 6,396,676Million Won→2024 16,929,147Million Won▲ +164.7%
Detached & tenement house Value of construction completed in original contract
2008 78,520Million Won→2024 2,065Million Won▼ −97.4%
Apartment Value of construction completed in original contract
2008 450,136Million Won→2024 232,726Million Won▼ −48.3%
Residential shop Value of construction completed in original contract
2008 301,948Million Won→2024 246,326Million Won▼ −18.4%
Market department store Value of construction completed in original contract
2008 248,830Million Won→2024 32,506Million Won▼ −86.9%
Business building Value of construction completed in original contract
2008 545,514Million Won→2024 853,743Million Won▲ +56.5%
Public building Value of construction completed in original contract
2008 39,520Million Won→2024 24,759Million Won▼ −37.4%
Hotel & lodgings Value of construction completed in original contract
2008 574,492Million Won→2024 252,494Million Won▼ −56.0%
Educational facilities Value of construction completed in original contract
2008 22,680Million Won→2024 101,876Million Won▲ +349.2%
Hospital Value of construction completed in original contract
2008 57,573Million Won→2024 268,508Million Won▲ +366.4%
Public & Performance Value of construction completed in original contract
2008 20,988Million Won→2023 11Million Won▼ −99.9%
Stadium & playground Value of construction completed in original contract
2008 1,619Million Won→2024 81,391Million Won▲ +4927.2%
Exhibition pavilion Value of construction completed in original contract
2008 106,621Million Won→2024 22,469Million Won▼ −78.9%
Factory & workshop Value of construction completed in original contract
2008 1,906,849Million Won→2024 14,249,534Million Won▲ +647.3%
Machine installation (except plant) Value of construction completed in original contract
2008 855Million Won→2024 314Million Won▼ −63.3%
Substation power plant Value of construction completed in original contract
2008 585,217Million Won→2024 42,903Million Won▼ −92.7%
Warehouse garage terminal building Value of construction completed in original contract
2008 455,753Million Won→2024 501,395Million Won▲ +10.0%
Hazardous property storehouse Value of construction completed in original contract
2008 62Million Won→2019 4,524Million Won▲ +7196.8%
Other Building Facilities Value of construction completed in original contract
2008 999,333Million Won→2024 4,116Million Won▼ −99.6%
Civil engineering Value of construction completed in original contract
2008 6,180,300Million Won→2024 7,446,665Million Won▲ +20.5%
General road Value of construction completed in original contract
2008 462,796Million Won→2024 671,422Million Won▲ +45.1%
Value of construction completed in subcontract
2008 1,882,284Million Won→2024 3,712,988Million Won▲ +97.3%
Building construction Value of construction completed in subcontract
2008 655,132Million Won→2024 1,006,949Million Won▲ +53.7%
Detached & tenement house Value of construction completed in subcontract
2008 6,868Million Won→2024 2,928Million Won▼ −57.4%
Apartment Value of construction completed in subcontract
2008 39,184Million Won→2024 66Million Won▼ −99.8%
Residential shop Value of construction completed in subcontract
2008 19,385Million Won→2024 3,354Million Won▼ −82.7%
Market department store Value of construction completed in subcontract
2008 107,873Million Won→2024 3,857Million Won▼ −96.4%
Business building Value of construction completed in subcontract
2008 30,632Million Won→2024 19,852Million Won▼ −35.2%
Public building Value of construction completed in subcontract
2008 15,622Million Won→2024 19,433Million Won▲ +24.4%
Hotel & lodgings Value of construction completed in subcontract
2008 79,986Million Won→2024 25,318Million Won▼ −68.3%
Educational facilities Value of construction completed in subcontract
2008 100,087Million Won→2024 773Million Won▼ −99.2%
Hospital Value of construction completed in subcontract
2008 8,313Million Won→2024 24,184Million Won▲ +190.9%
Stadium & playground Value of construction completed in subcontract
2008 145Million Won→2023 640Million Won▲ +341.4%
Exhibition pavilion Value of construction completed in subcontract
2008 6,431Million Won→2024 8,411Million Won▲ +30.8%
Factory & workshop Value of construction completed in subcontract
2008 144,275Million Won→2024 828,264Million Won▲ +474.1%
Machine installation (except plant) Value of construction completed in subcontract
2008 27,033Million Won→2024 34Million Won▼ −99.9%
Substation power plant Value of construction completed in subcontract
2008 35,120Million Won→2024 11,120Million Won▼ −68.3%
Warehouse garage terminal building Value of construction completed in subcontract
2008 869Million Won→2024 56,033Million Won▲ +6348.0%
Other Building Facilities Value of construction completed in subcontract
2008 30,670Million Won→2024 3,322Million Won▼ −89.2%
Civil engineering Value of construction completed in subcontract
2008 774,085Million Won→2024 217,890Million Won▼ −71.9%
General road Value of construction completed in subcontract
2008 131,920Million Won→2024 3,655Million Won▼ −97.2%
Value of carry-over work
2008 96,203,246Million Won→2024 168,700,510Million Won▲ +75.4%
Building construction Value of carry-over work
2008 21,473,828Million Won→2024 33,839,493Million Won▲ +57.6%
Detached & tenement house Value of carry-over work
2008 191,969Million Won→2024 93,964Million Won▼ −51.1%
Apartment Value of carry-over work
2008 6,218,199Million Won→2024 10,146,015Million Won▲ +63.2%
Residential shop Value of carry-over work
2008 2,826,638Million Won→2024 3,240,075Million Won▲ +14.6%
Market department store Value of carry-over work
2008 762,591Million Won→2024 545,808Million Won▼ −28.4%
Business building Value of carry-over work
2008 1,521,204Million Won→2024 1,522,933Million Won▲ +0.1%
Public building Value of carry-over work
2008 91,883Million Won→2024 364,678Million Won▲ +296.9%
Hotel & lodgings Value of carry-over work
2008 1,773,085Million Won→2024 2,221,043Million Won▲ +25.3%
Educational facilities Value of carry-over work
2008 421,130Million Won→2024 230,649Million Won▼ −45.2%
Hospital Value of carry-over work
2008 562,792Million Won→2024 789,957Million Won▲ +40.4%
Church & temple Value of carry-over work
2013 21,976Million Won→2024 22,010Million Won▲ +0.2%
Public & Performance Value of carry-over work
2008 12,503Million Won→2024 1,264Million Won▼ −89.9%
Stadium & playground Value of carry-over work
2009 4,536Million Won→2024 91,605Million Won▲ +1919.5%
Exhibition pavilion Value of carry-over work
2008 232,471Million Won→2024 14,381Million Won▼ −93.8%
Factory & workshop Value of carry-over work
2008 1,625,972Million Won→2024 11,877,025Million Won▲ +630.5%
Machine installation (except plant) Value of carry-over work
2008 26,060Million Won→2024 132Million Won▼ −99.5%
Substation power plant Value of carry-over work
2008 1,782,266Million Won→2024 709,172Million Won▼ −60.2%
Warehouse garage terminal building Value of carry-over work
2008 1,482,680Million Won→2024 1,894,523Million Won▲ +27.8%
Hazardous property storehouse Value of carry-over work
2008 5,486Million Won→2024 8,354Million Won▲ +52.3%
Other Building Facilities Value of carry-over work
2008 1,936,630Million Won→2024 63,691Million Won▼ −96.7%
Civil engineering Value of carry-over work
2008 20,513,089Million Won→2024 29,728,926Million Won▲ +44.9%
General road Value of carry-over work
2008 1,707,923Million Won→2024 903,884Million Won▼ −47.1%
Value of orders received
2008 48,901,833Million Won→2024 41,918,880Million Won▼ −14.3%
Building construction Value of orders received
2008 8,866,956Million Won→2024 5,130,317Million Won▼ −42.1%
Detached & tenement house Value of orders received
2008 245,093Million Won→2024 5,338Million Won▼ −97.8%
Apartment Value of orders received
2008 1,564,906Million Won→2024 132,213Million Won▼ −91.6%
Residential shop Value of orders received
2008 1,484,183Million Won→2024 115,056Million Won▼ −92.2%
Market department store Value of orders received
2008 161,860Million Won→2024 323,709Million Won▲ +100.0%
Business building Value of orders received
2008 687,132Million Won→2024 70,276Million Won▼ −89.8%
Public building Value of orders received
2008 34,481Million Won→2024 54,637Million Won▲ +58.5%
Hotel & lodgings Value of orders received
2008 644,419Million Won→2024 575,774Million Won▼ −10.7%
Educational facilities Value of orders received
2008 378,330Million Won→2024 3,563Million Won▼ −99.1%
Hospital Value of orders received
2008 363,888Million Won→2024 77,799Million Won▼ −78.6%
Public & Performance Value of orders received
2008 402Million Won→2023 11Million Won▼ −97.3%
Stadium & playground Value of orders received
2008 570Million Won→2024 19,862Million Won▲ +3384.6%
Exhibition pavilion Value of orders received
2008 306,141Million Won→2024 13,774Million Won▼ −95.5%
Factory & workshop Value of orders received
2008 1,327,882Million Won→2024 3,622,204Million Won▲ +172.8%
Machine installation (except plant) Value of orders received
2008 35,521Million Won→2024 334Million Won▼ −99.1%
Substation power plant Value of orders received
2008 246,757Million Won→2024 88,818Million Won▼ −64.0%
Warehouse garage terminal building Value of orders received
2008 138,383Million Won→2024 2,960Million Won▼ −97.9%
Hazardous property storehouse Value of orders received
2008 5,548Million Won→2023 8,354Million Won▲ +50.6%
Other Building Facilities Value of orders received
2008 1,240,505Million Won→2024 9,763Million Won▼ −99.2%
Civil engineering Value of orders received
2008 13,342,045Million Won→2024 2,732,785Million Won▼ −79.5%
General road Value of orders received
2008 1,336,104Million Won→2024 50,433Million Won▼ −96.2%
Data source
- Organization
- 통계청
- Dataset
- 산업세분류 및 조직형태별 총괄
- Provider
- KOSIS 국가통계포털
- Period
- 2008 ~ 2024
- As of
- 2026-08-29
- Processing
- KOSIS OpenAPI 로 연간 전국값을 받아 그대로 사용. 가공 없음.
Other surveys in this category
- Construction Industry Survey1 tables · 102 items
- Construction Business Trend Survey13 tables · 159 items
- Building Permit, Start and Completion Statistics4 tables · 26 items
- Building Statistics1 tables · 113 items
- Urban Redevelopment Project Status5 tables · 26 items
- Overseas Construction Orders Statistics3 tables · 78 items