Construction Industry Survey (43/49)
1 tables and 144 items from the KOSIS survey “Construction Industry Survey”, as annual figures and charts.
공사지역/등록업종별 계약액,기성액,원도급 및 하도급공사 기성액,미기성액
Back to top공사지역별 전체 · 등록업종별 합 계
- Total Value of orders received in original contract
- General construction Value of orders received in original contract
- Special construction Value of orders received in original contract
- Ground construction and pavement Value of orders received in original contract
- Excavating and earthmoving Value of orders received in original contract
- Pavement Value of orders received in original contract
- Boring & grouting works Value of orders received in original contract
- Interior architecture works Value of orders received in original contract
- Interior architecture works Value of orders received in original contract
- Metal structure installation and Roofing prefabrication construction Value of orders received in original contract
- Metal structure installation and Erection of doors and Greenhouse construction Value of orders received in original contract
- Roofing sheet metal prefabrication Value of orders received in original contract
- Painting Plastering waterproofing Stone construction Value of orders received in original contract
- Painting works Value of orders received in original contract
- Plastering waterproofing construction business Value of orders received in original contract
- Stone works Value of orders received in original contract
- Landscape Planting and FacilityWorks Value of orders received in original contract
- Landscape Planting Works Value of orders received in original contract
- Landscape Works Facility Value of orders received in original contract
- Steel Reinforcing and Reinforced Concrete Works Value of orders received in original contract
- Steel Reinforcing and Reinforced Concrete Works Value of orders received in original contract
- Scaffolding demolition works Value of orders received in original contract
- Scaffolding demolition works Value of orders received in original contract
- Water supply & sewerages Value of orders received in original contract
- Total Value of construction completed
- General construction Value of construction completed
- Special construction Value of construction completed
- Ground construction and pavement Value of construction completed
- Excavating and earthmoving Value of construction completed
- Pavement Value of construction completed
- Boring & grouting works Value of construction completed
- Interior architecture works Value of construction completed
- Interior architecture works Value of construction completed
- Metal structure installation and Roofing prefabrication construction Value of construction completed
- Metal structure installation and Erection of doors and Greenhouse construction Value of construction completed
- Roofing sheet metal prefabrication Value of construction completed
- Painting Plastering waterproofing Stone construction Value of construction completed
- Painting works Value of construction completed
- Plastering waterproofing construction business Value of construction completed
- Stone works Value of construction completed
- Landscape Planting and FacilityWorks Value of construction completed
- Landscape Planting Works Value of construction completed
- Landscape Works Facility Value of construction completed
- Steel Reinforcing and Reinforced Concrete Works Value of construction completed
- Steel Reinforcing and Reinforced Concrete Works Value of construction completed
- Scaffolding demolition works Value of construction completed
- Scaffolding demolition works Value of construction completed
- Water supply & sewerages Value of construction completed
- Total Value of construction completed in original contract
- General construction Value of construction completed in original contract
- Special construction Value of construction completed in original contract
- Ground construction and pavement Value of construction completed in original contract
- Excavating and earthmoving Value of construction completed in original contract
- Pavement Value of construction completed in original contract
- Boring & grouting works Value of construction completed in original contract
- Interior architecture works Value of construction completed in original contract
- Interior architecture works Value of construction completed in original contract
- Metal structure installation and Roofing prefabrication construction Value of construction completed in original contract
- Metal structure installation and Erection of doors and Greenhouse construction Value of construction completed in original contract
- Roofing sheet metal prefabrication Value of construction completed in original contract
- Painting Plastering waterproofing Stone construction Value of construction completed in original contract
- Painting works Value of construction completed in original contract
- Plastering waterproofing construction business Value of construction completed in original contract
- Stone works Value of construction completed in original contract
- Landscape Planting and FacilityWorks Value of construction completed in original contract
- Landscape Planting Works Value of construction completed in original contract
- Landscape Works Facility Value of construction completed in original contract
- Steel Reinforcing and Reinforced Concrete Works Value of construction completed in original contract
- Steel Reinforcing and Reinforced Concrete Works Value of construction completed in original contract
- Scaffolding demolition works Value of construction completed in original contract
- Scaffolding demolition works Value of construction completed in original contract
- Water supply & sewerages Value of construction completed in original contract
- Total Value of construction completed in subcontract
- General construction Value of construction completed in subcontract
- Special construction Value of construction completed in subcontract
- Ground construction and pavement Value of construction completed in subcontract
- Excavating and earthmoving Value of construction completed in subcontract
- Pavement Value of construction completed in subcontract
- Boring & grouting works Value of construction completed in subcontract
- Interior architecture works Value of construction completed in subcontract
- Interior architecture works Value of construction completed in subcontract
- Metal structure installation and Roofing prefabrication construction Value of construction completed in subcontract
- Metal structure installation and Erection of doors and Greenhouse construction Value of construction completed in subcontract
- Roofing sheet metal prefabrication Value of construction completed in subcontract
- Painting Plastering waterproofing Stone construction Value of construction completed in subcontract
- Painting works Value of construction completed in subcontract
- Plastering waterproofing construction business Value of construction completed in subcontract
- Stone works Value of construction completed in subcontract
- Landscape Planting and FacilityWorks Value of construction completed in subcontract
- Landscape Planting Works Value of construction completed in subcontract
- Landscape Works Facility Value of construction completed in subcontract
- Steel Reinforcing and Reinforced Concrete Works Value of construction completed in subcontract
- Steel Reinforcing and Reinforced Concrete Works Value of construction completed in subcontract
- Scaffolding demolition works Value of construction completed in subcontract
- Scaffolding demolition works Value of construction completed in subcontract
- Water supply & sewerages Value of construction completed in subcontract
- Total Value of carry-over work
- General construction Value of carry-over work
- Special construction Value of carry-over work
- Ground construction and pavement Value of carry-over work
- Excavating and earthmoving Value of carry-over work
- Pavement Value of carry-over work
- Boring & grouting works Value of carry-over work
- Interior architecture works Value of carry-over work
- Interior architecture works Value of carry-over work
- Metal structure installation and Roofing prefabrication construction Value of carry-over work
- Metal structure installation and Erection of doors and Greenhouse construction Value of carry-over work
- Roofing sheet metal prefabrication Value of carry-over work
- Painting Plastering waterproofing Stone construction Value of carry-over work
- Painting works Value of carry-over work
- Plastering waterproofing construction business Value of carry-over work
- Stone works Value of carry-over work
- Landscape Planting and FacilityWorks Value of carry-over work
- Landscape Planting Works Value of carry-over work
- Landscape Works Facility Value of carry-over work
- Steel Reinforcing and Reinforced Concrete Works Value of carry-over work
- Steel Reinforcing and Reinforced Concrete Works Value of carry-over work
- Scaffolding demolition works Value of carry-over work
- Scaffolding demolition works Value of carry-over work
- Water supply & sewerages Value of carry-over work
- Total Value of orders received
- General construction Value of orders received
- Special construction Value of orders received
- Ground construction and pavement Value of orders received
- Excavating and earthmoving Value of orders received
- Pavement Value of orders received
- Boring & grouting works Value of orders received
- Interior architecture works Value of orders received
- Interior architecture works Value of orders received
- Metal structure installation and Roofing prefabrication construction Value of orders received
- Metal structure installation and Erection of doors and Greenhouse construction Value of orders received
- Roofing sheet metal prefabrication Value of orders received
- Painting Plastering waterproofing Stone construction Value of orders received
- Painting works Value of orders received
- Plastering waterproofing construction business Value of orders received
- Stone works Value of orders received
- Landscape Planting and FacilityWorks Value of orders received
- Landscape Planting Works Value of orders received
- Landscape Works Facility Value of orders received
- Steel Reinforcing and Reinforced Concrete Works Value of orders received
- Steel Reinforcing and Reinforced Concrete Works Value of orders received
- Scaffolding demolition works Value of orders received
- Scaffolding demolition works Value of orders received
- Water supply & sewerages Value of orders received
Total Value of orders received in original contract
2008 228,298,526Mill. Won→2024 308,337,031Mill. Won▲ +35.1%
General construction Value of orders received in original contract
2008 180,951,409Mill. Won→2024 221,228,358Mill. Won▲ +22.3%
Special construction Value of orders received in original contract
2008 20,718,954Mill. Won→2024 39,204,663Mill. Won▲ +89.2%
Ground construction and pavement Value of orders received in original contract
2008 1,657,510Mill. Won→2024 3,891,888Mill. Won▲ +134.8%
Excavating and earthmoving Value of orders received in original contract
2008 906,954Mill. Won→2024 1,681,101Mill. Won▲ +85.4%
Pavement Value of orders received in original contract
2008 591,952Mill. Won→2024 2,092,710Mill. Won▲ +253.5%
Boring & grouting works Value of orders received in original contract
2008 158,604Mill. Won→2024 118,077Mill. Won▼ −25.6%
Interior architecture works Value of orders received in original contract
2008 3,808,803Mill. Won→2024 8,766,364Mill. Won▲ +130.2%
Interior architecture works Value of orders received in original contract
2008 3,808,803Mill. Won→2024 8,766,364Mill. Won▲ +130.2%
Metal structure installation and Roofing prefabrication construction Value of orders received in original contract
2008 1,631,785Mill. Won→2024 2,952,815Mill. Won▲ +81.0%
Metal structure installation and Erection of doors and Greenhouse construction Value of orders received in original contract
2008 1,500,472Mill. Won→2024 2,615,737Mill. Won▲ +74.3%
Roofing sheet metal prefabrication Value of orders received in original contract
2008 131,313Mill. Won→2024 337,078Mill. Won▲ +156.7%
Painting Plastering waterproofing Stone construction Value of orders received in original contract
2008 1,360,316Mill. Won→2024 3,373,153Mill. Won▲ +148.0%
Painting works Value of orders received in original contract
2008 520,183Mill. Won→2024 1,587,334Mill. Won▲ +205.1%
Plastering waterproofing construction business Value of orders received in original contract
2008 482,659Mill. Won→2024 1,309,762Mill. Won▲ +171.4%
Stone works Value of orders received in original contract
2008 357,474Mill. Won→2024 476,057Mill. Won▲ +33.2%
Landscape Planting and FacilityWorks Value of orders received in original contract
2008 991,481Mill. Won→2024 2,260,599Mill. Won▲ +128.0%
Landscape Planting Works Value of orders received in original contract
2008 680,462Mill. Won→2024 1,474,119Mill. Won▲ +116.6%
Landscape Works Facility Value of orders received in original contract
2008 311,019Mill. Won→2024 786,480Mill. Won▲ +152.9%
Steel Reinforcing and Reinforced Concrete Works Value of orders received in original contract
2008 1,961,869Mill. Won→2024 1,912,418Mill. Won▼ −2.5%
Steel Reinforcing and Reinforced Concrete Works Value of orders received in original contract
2008 1,961,869Mill. Won→2024 1,912,418Mill. Won▼ −2.5%
Scaffolding demolition works Value of orders received in original contract
2008 373,006Mill. Won→2024 872,462Mill. Won▲ +133.9%
Scaffolding demolition works Value of orders received in original contract
2008 373,006Mill. Won→2024 872,462Mill. Won▲ +133.9%
Water supply & sewerages Value of orders received in original contract
2008 1,388,805Mill. Won→2024 2,152,766Mill. Won▲ +55.0%
Total Value of construction completed
2008 211,555,501Million Won→2024 363,827,822Million Won▲ +72.0%
General construction Value of construction completed
2008 103,920,051Million Won→2024 161,307,163Million Won▲ +55.2%
Special construction Value of construction completed
2008 76,084,130Million Won→2024 133,420,790Million Won▲ +75.4%
Ground construction and pavement Value of construction completed
2008 13,226,130Million Won→2024 19,383,448Million Won▲ +46.6%
Excavating and earthmoving Value of construction completed
2008 11,026,169Million Won→2024 14,391,201Million Won▲ +30.5%
Pavement Value of construction completed
2008 1,313,581Million Won→2024 3,069,244Million Won▲ +133.7%
Boring & grouting works Value of construction completed
2008 886,380Million Won→2024 1,923,003Million Won▲ +117.0%
Interior architecture works Value of construction completed
2008 7,726,928Million Won→2024 16,268,546Million Won▲ +110.5%
Interior architecture works Value of construction completed
2008 7,726,928Million Won→2024 16,268,546Million Won▲ +110.5%
Metal structure installation and Roofing prefabrication construction Value of construction completed
2008 7,644,106Million Won→2024 15,303,411Million Won▲ +100.2%
Metal structure installation and Erection of doors and Greenhouse construction Value of construction completed
2008 6,468,208Million Won→2024 12,232,427Million Won▲ +89.1%
Roofing sheet metal prefabrication Value of construction completed
2008 1,175,898Million Won→2024 3,070,984Million Won▲ +161.2%
Painting Plastering waterproofing Stone construction Value of construction completed
2008 6,079,058Million Won→2024 12,133,826Million Won▲ +99.6%
Painting works Value of construction completed
2008 1,319,655Million Won→2024 3,144,978Million Won▲ +138.3%
Plastering waterproofing construction business Value of construction completed
2008 2,822,697Million Won→2024 6,421,377Million Won▲ +127.5%
Stone works Value of construction completed
2008 1,936,706Million Won→2024 2,567,471Million Won▲ +32.6%
Landscape Planting and FacilityWorks Value of construction completed
2008 3,432,850Million Won→2024 5,073,986Million Won▲ +47.8%
Landscape Planting Works Value of construction completed
2008 2,091,904Million Won→2024 2,984,591Million Won▲ +42.7%
Landscape Works Facility Value of construction completed
2008 1,340,946Million Won→2024 2,089,395Million Won▲ +55.8%
Steel Reinforcing and Reinforced Concrete Works Value of construction completed
2008 13,086,099Million Won→2024 23,035,654Million Won▲ +76.0%
Steel Reinforcing and Reinforced Concrete Works Value of construction completed
2008 13,086,099Million Won→2024 23,035,654Million Won▲ +76.0%
Scaffolding demolition works Value of construction completed
2008 1,540,198Million Won→2024 2,889,472Million Won▲ +87.6%
Scaffolding demolition works Value of construction completed
2008 1,540,198Million Won→2024 2,889,472Million Won▲ +87.6%
Water supply & sewerages Value of construction completed
2008 2,906,688Million Won→2024 4,045,221Million Won▲ +39.2%
Total Value of construction completed in original contract
2008 145,571,069Million Won→2024 240,164,060Million Won▲ +65.0%
General construction Value of construction completed in original contract
2008 101,082,144Million Won→2024 154,129,818Million Won▲ +52.5%
Special construction Value of construction completed in original contract
2008 19,289,575Million Won→2024 36,263,218Million Won▲ +88.0%
Ground construction and pavement Value of construction completed in original contract
2008 1,373,825Million Won→2024 3,649,464Million Won▲ +165.6%
Excavating and earthmoving Value of construction completed in original contract
2008 723,339Million Won→2024 1,411,036Million Won▲ +95.1%
Pavement Value of construction completed in original contract
2008 526,350Million Won→2024 2,107,975Million Won▲ +300.5%
Boring & grouting works Value of construction completed in original contract
2008 124,136Million Won→2024 130,453Million Won▲ +5.1%
Interior architecture works Value of construction completed in original contract
2008 3,568,872Million Won→2024 7,287,152Million Won▲ +104.2%
Interior architecture works Value of construction completed in original contract
2008 3,568,872Million Won→2024 7,287,152Million Won▲ +104.2%
Metal structure installation and Roofing prefabrication construction Value of construction completed in original contract
2008 1,428,407Million Won→2024 2,974,433Million Won▲ +108.2%
Metal structure installation and Erection of doors and Greenhouse construction Value of construction completed in original contract
2008 1,326,343Million Won→2024 2,674,971Million Won▲ +101.7%
Roofing sheet metal prefabrication Value of construction completed in original contract
2008 102,064Million Won→2024 299,462Million Won▲ +193.4%
Painting Plastering waterproofing Stone construction Value of construction completed in original contract
2008 1,225,631Million Won→2024 3,064,250Million Won▲ +150.0%
Painting works Value of construction completed in original contract
2008 465,381Million Won→2024 1,451,847Million Won▲ +212.0%
Plastering waterproofing construction business Value of construction completed in original contract
2008 435,015Million Won→2024 1,097,416Million Won▲ +152.3%
Stone works Value of construction completed in original contract
2008 325,235Million Won→2024 514,987Million Won▲ +58.3%
Landscape Planting and FacilityWorks Value of construction completed in original contract
2008 921,952Million Won→2024 2,452,729Million Won▲ +166.0%
Landscape Planting Works Value of construction completed in original contract
2008 640,987Million Won→2024 1,519,553Million Won▲ +137.1%
Landscape Works Facility Value of construction completed in original contract
2008 280,965Million Won→2024 933,176Million Won▲ +232.1%
Steel Reinforcing and Reinforced Concrete Works Value of construction completed in original contract
2008 1,715,947Million Won→2024 2,039,346Million Won▲ +18.8%
Steel Reinforcing and Reinforced Concrete Works Value of construction completed in original contract
2008 1,715,947Million Won→2024 2,039,346Million Won▲ +18.8%
Scaffolding demolition works Value of construction completed in original contract
2008 380,048Million Won→2024 897,281Million Won▲ +136.1%
Scaffolding demolition works Value of construction completed in original contract
2008 380,048Million Won→2024 897,281Million Won▲ +136.1%
Water supply & sewerages Value of construction completed in original contract
2008 1,207,334Million Won→2024 2,259,983Million Won▲ +87.2%
Total Value of construction completed in subcontract
2008 65,984,431Million Won→2024 123,663,762Million Won▲ +87.4%
General construction Value of construction completed in subcontract
2008 2,837,907Million Won→2024 7,177,345Million Won▲ +152.9%
Special construction Value of construction completed in subcontract
2008 56,794,555Million Won→2024 97,157,572Million Won▲ +71.1%
Ground construction and pavement Value of construction completed in subcontract
2008 11,852,303Million Won→2024 15,733,984Million Won▲ +32.8%
Excavating and earthmoving Value of construction completed in subcontract
2008 10,302,829Million Won→2024 12,980,165Million Won▲ +26.0%
Pavement Value of construction completed in subcontract
2008 787,230Million Won→2024 961,269Million Won▲ +22.1%
Boring & grouting works Value of construction completed in subcontract
2008 762,244Million Won→2024 1,792,550Million Won▲ +135.2%
Interior architecture works Value of construction completed in subcontract
2008 4,158,056Million Won→2024 8,981,394Million Won▲ +116.0%
Interior architecture works Value of construction completed in subcontract
2008 4,158,056Million Won→2024 8,981,394Million Won▲ +116.0%
Metal structure installation and Roofing prefabrication construction Value of construction completed in subcontract
2008 6,215,698Million Won→2024 12,328,977Million Won▲ +98.4%
Metal structure installation and Erection of doors and Greenhouse construction Value of construction completed in subcontract
2008 5,141,865Million Won→2024 9,557,455Million Won▲ +85.9%
Roofing sheet metal prefabrication Value of construction completed in subcontract
2008 1,073,833Million Won→2024 2,771,522Million Won▲ +158.1%
Painting Plastering waterproofing Stone construction Value of construction completed in subcontract
2008 4,853,425Million Won→2024 9,069,575Million Won▲ +86.9%
Painting works Value of construction completed in subcontract
2008 854,274Million Won→2024 1,693,131Million Won▲ +98.2%
Plastering waterproofing construction business Value of construction completed in subcontract
2008 2,387,681Million Won→2024 5,323,961Million Won▲ +123.0%
Stone works Value of construction completed in subcontract
2008 1,611,470Million Won→2024 2,052,483Million Won▲ +27.4%
Landscape Planting and FacilityWorks Value of construction completed in subcontract
2008 2,510,898Million Won→2024 2,621,258Million Won▲ +4.4%
Landscape Planting Works Value of construction completed in subcontract
2008 1,450,917Million Won→2024 1,465,039Million Won▲ +1.0%
Landscape Works Facility Value of construction completed in subcontract
2008 1,059,981Million Won→2024 1,156,219Million Won▲ +9.1%
Steel Reinforcing and Reinforced Concrete Works Value of construction completed in subcontract
2008 11,370,151Million Won→2024 20,996,308Million Won▲ +84.7%
Steel Reinforcing and Reinforced Concrete Works Value of construction completed in subcontract
2008 11,370,151Million Won→2024 20,996,308Million Won▲ +84.7%
Scaffolding demolition works Value of construction completed in subcontract
2008 1,160,150Million Won→2024 1,992,191Million Won▲ +71.7%
Scaffolding demolition works Value of construction completed in subcontract
2008 1,160,150Million Won→2024 1,992,191Million Won▲ +71.7%
Water supply & sewerages Value of construction completed in subcontract
2008 1,699,354Million Won→2024 1,785,239Million Won▲ +5.1%
Total Value of carry-over work
2008 356,583,238Million Won→2024 649,054,323Million Won▲ +82.0%
General construction Value of carry-over work
2008 297,436,507Million Won→2024 532,649,634Million Won▲ +79.1%
Special construction Value of carry-over work
2008 41,184,706Million Won→2024 79,173,418Million Won▲ +92.2%
Ground construction and pavement Value of carry-over work
2008 11,371,262Million Won→2024 16,181,559Million Won▲ +42.3%
Excavating and earthmoving Value of carry-over work
2008 10,132,633Million Won→2024 13,900,485Million Won▲ +37.2%
Pavement Value of carry-over work
2008 683,516Million Won→2024 794,642Million Won▲ +16.3%
Boring & grouting works Value of carry-over work
2008 555,113Million Won→2024 1,486,432Million Won▲ +167.8%
Interior architecture works Value of carry-over work
2008 2,119,595Million Won→2024 5,471,778Million Won▲ +158.2%
Interior architecture works Value of carry-over work
2008 2,119,595Million Won→2024 5,471,778Million Won▲ +158.2%
Metal structure installation and Roofing prefabrication construction Value of carry-over work
2008 3,014,053Million Won→2024 6,571,566Million Won▲ +118.0%
Metal structure installation and Erection of doors and Greenhouse construction Value of carry-over work
2008 2,746,908Million Won→2024 5,334,924Million Won▲ +94.2%
Roofing sheet metal prefabrication Value of carry-over work
2008 267,145Million Won→2024 1,236,642Million Won▲ +362.9%
Painting Plastering waterproofing Stone construction Value of carry-over work
2008 2,651,440Million Won→2024 4,817,494Million Won▲ +81.7%
Painting works Value of carry-over work
2008 353,192Million Won→2024 978,103Million Won▲ +176.9%
Plastering waterproofing construction business Value of carry-over work
2008 1,633,152Million Won→2024 3,018,989Million Won▲ +84.9%
Stone works Value of carry-over work
2008 665,096Million Won→2024 820,402Million Won▲ +23.4%
Landscape Planting and FacilityWorks Value of carry-over work
2008 1,344,997Million Won→2024 1,277,391Million Won▼ −5.0%
Landscape Planting Works Value of carry-over work
2008 833,698Million Won→2024 798,069Million Won▼ −4.3%
Landscape Works Facility Value of carry-over work
2008 511,299Million Won→2024 479,322Million Won▼ −6.3%
Steel Reinforcing and Reinforced Concrete Works Value of carry-over work
2008 8,498,059Million Won→2024 16,921,689Million Won▲ +99.1%
Steel Reinforcing and Reinforced Concrete Works Value of carry-over work
2008 8,498,059Million Won→2024 16,921,689Million Won▲ +99.1%
Scaffolding demolition works Value of carry-over work
2008 971,902Million Won→2024 1,841,935Million Won▲ +89.5%
Scaffolding demolition works Value of carry-over work
2008 971,902Million Won→2024 1,841,935Million Won▲ +89.5%
Water supply & sewerages Value of carry-over work
2008 1,731,676Million Won→2024 1,878,025Million Won▲ +8.5%
Total Value of orders received
2008 283,780,498Million Won→2024 384,771,680Million Won▲ +35.6%
General construction Value of orders received
2008 183,591,374Million Won→2024 227,182,957Million Won▲ +23.7%
Special construction Value of orders received
2008 73,413,993Million Won→2024 109,684,713Million Won▲ +49.4%
Ground construction and pavement Value of orders received
2008 12,333,391Million Won→2024 16,092,317Million Won▲ +30.5%
Excavating and earthmoving Value of orders received
2008 10,342,089Million Won→2024 11,653,963Million Won▲ +12.7%
Pavement Value of orders received
2008 1,300,430Million Won→2024 2,835,067Million Won▲ +118.0%
Boring & grouting works Value of orders received
2008 690,872Million Won→2024 1,603,287Million Won▲ +132.1%
Interior architecture works Value of orders received
2008 7,362,748Million Won→2024 15,556,805Million Won▲ +111.3%
Interior architecture works Value of orders received
2008 7,362,748Million Won→2024 15,556,805Million Won▲ +111.3%
Metal structure installation and Roofing prefabrication construction Value of orders received
2008 7,459,718Million Won→2024 12,191,481Million Won▲ +63.4%
Metal structure installation and Erection of doors and Greenhouse construction Value of orders received
2008 6,297,414Million Won→2024 9,739,570Million Won▲ +54.7%
Roofing sheet metal prefabrication Value of orders received
2008 1,162,304Million Won→2024 2,451,911Million Won▲ +111.0%
Painting Plastering waterproofing Stone construction Value of orders received
2008 5,899,992Million Won→2024 9,965,782Million Won▲ +68.9%
Painting works Value of orders received
2008 1,229,105Million Won→2024 2,940,338Million Won▲ +139.2%
Plastering waterproofing construction business Value of orders received
2008 2,881,794Million Won→2024 5,044,089Million Won▲ +75.0%
Stone works Value of orders received
2008 1,789,093Million Won→2024 1,981,355Million Won▲ +10.7%
Landscape Planting and FacilityWorks Value of orders received
2008 3,205,924Million Won→2024 4,313,801Million Won▲ +34.6%
Landscape Planting Works Value of orders received
2008 1,943,456Million Won→2024 2,619,027Million Won▲ +34.8%
Landscape Works Facility Value of orders received
2008 1,262,468Million Won→2024 1,694,774Million Won▲ +34.2%
Steel Reinforcing and Reinforced Concrete Works Value of orders received
2008 13,161,614Million Won→2024 17,044,563Million Won▲ +29.5%
Steel Reinforcing and Reinforced Concrete Works Value of orders received
2008 13,161,614Million Won→2024 17,044,563Million Won▲ +29.5%
Scaffolding demolition works Value of orders received
2008 1,456,722Million Won→2024 2,420,222Million Won▲ +66.1%
Scaffolding demolition works Value of orders received
2008 1,456,722Million Won→2024 2,420,222Million Won▲ +66.1%
Water supply & sewerages Value of orders received
2008 3,140,303Million Won→2024 3,650,804Million Won▲ +16.3%
Data source
- Organization
- 통계청
- Dataset
- 산업세분류 및 조직형태별 총괄
- Provider
- KOSIS 국가통계포털
- Period
- 2008 ~ 2024
- As of
- 2026-08-29
- Processing
- KOSIS OpenAPI 로 연간 전국값을 받아 그대로 사용. 가공 없음.
Other surveys in this category
- Construction Industry Survey1 tables · 102 items
- Construction Business Trend Survey13 tables · 159 items
- Building Permit, Start and Completion Statistics4 tables · 26 items
- Building Statistics1 tables · 113 items
- Urban Redevelopment Project Status5 tables · 26 items
- Overseas Construction Orders Statistics3 tables · 78 items