Construction Industry Survey (36/49)
1 tables and 138 items from the KOSIS survey “Construction Industry Survey”, as annual figures and charts.
산업세분류/종사자규모별 공사비용
Back to top산업별 건설업 · 종사자규모별 계
- Construction Total
- General construction Total
- Building construction Total
- Residential building construction Total
- Non-residential building construction Total
- Heavy and civil engineering construction Total
- Land subdivision with land improvement Total
- Construction of civil engineering projects Total
- Specialized construction activities Total
- Site preparation and construction of foundation works and structures Total
- Site preparation and related construction Total
- Erecting assembling and framing structural parts and masonry works Total
- Other erecting assembling and framing structural parts and masonry works Total
- Construction of installing building equipment Total
- Construction of installing building equipment Total
- Electrical and communication works Total
- Electrical works Total
- Communication works Total
- Building completion and finishing Total
- Painting papering and finishing carpentry works Total
- Glazing works and joinery installation Total
- Other building completion and finishing Total
- Repair and maintenance works for construction works and supplementary facilities Total
- Construction Raw material costs
- General construction Raw material costs
- Building construction Raw material costs
- Residential building construction Raw material costs
- Non-residential building construction Raw material costs
- Heavy and civil engineering construction Raw material costs
- Land subdivision with land improvement Raw material costs
- Construction of civil engineering projects Raw material costs
- Specialized construction activities Raw material costs
- Site preparation and construction of foundation works and structures Raw material costs
- Site preparation and related construction Raw material costs
- Erecting assembling and framing structural parts and masonry works Raw material costs
- Other erecting assembling and framing structural parts and masonry works Raw material costs
- Construction of installing building equipment Raw material costs
- Construction of installing building equipment Raw material costs
- Electrical and communication works Raw material costs
- Electrical works Raw material costs
- Communication works Raw material costs
- Building completion and finishing Raw material costs
- Painting papering and finishing carpentry works Raw material costs
- Glazing works and joinery installation Raw material costs
- Other building completion and finishing Raw material costs
- Repair and maintenance works for construction works and supplementary facilities Raw material costs
- Construction Ancillary material costs
- General construction Ancillary material costs
- Building construction Ancillary material costs
- Residential building construction Ancillary material costs
- Non-residential building construction Ancillary material costs
- Heavy and civil engineering construction Ancillary material costs
- Land subdivision with land improvement Ancillary material costs
- Construction of civil engineering projects Ancillary material costs
- Specialized construction activities Ancillary material costs
- Site preparation and construction of foundation works and structures Ancillary material costs
- Site preparation and related construction Ancillary material costs
- Erecting assembling and framing structural parts and masonry works Ancillary material costs
- Other erecting assembling and framing structural parts and masonry works Ancillary material costs
- Construction of installing building equipment Ancillary material costs
- Construction of installing building equipment Ancillary material costs
- Electrical and communication works Ancillary material costs
- Electrical works Ancillary material costs
- Communication works Ancillary material costs
- Building completion and finishing Ancillary material costs
- Painting papering and finishing carpentry works Ancillary material costs
- Glazing works and joinery installation Ancillary material costs
- Other building completion and finishing Ancillary material costs
- Repair and maintenance works for construction works and supplementary facilities Ancillary material costs
- Construction Labour cost
- General construction Labour cost
- Building construction Labour cost
- Residential building construction Labour cost
- Non-residential building construction Labour cost
- Heavy and civil engineering construction Labour cost
- Land subdivision with land improvement Labour cost
- Construction of civil engineering projects Labour cost
- Specialized construction activities Labour cost
- Site preparation and construction of foundation works and structures Labour cost
- Site preparation and related construction Labour cost
- Erecting assembling and framing structural parts and masonry works Labour cost
- Other erecting assembling and framing structural parts and masonry works Labour cost
- Construction of installing building equipment Labour cost
- Construction of installing building equipment Labour cost
- Electrical and communication works Labour cost
- Electrical works Labour cost
- Communication works Labour cost
- Building completion and finishing Labour cost
- Painting papering and finishing carpentry works Labour cost
- Glazing works and joinery installation Labour cost
- Other building completion and finishing Labour cost
- Repair and maintenance works for construction works and supplementary facilities Labour cost
- Construction Cost for welfare work
- General construction Cost for welfare work
- Building construction Cost for welfare work
- Residential building construction Cost for welfare work
- Non-residential building construction Cost for welfare work
- Heavy and civil engineering construction Cost for welfare work
- Land subdivision with land improvement Cost for welfare work
- Construction of civil engineering projects Cost for welfare work
- Specialized construction activities Cost for welfare work
- Site preparation and construction of foundation works and structures Cost for welfare work
- Site preparation and related construction Cost for welfare work
- Erecting assembling and framing structural parts and masonry works Cost for welfare work
- Other erecting assembling and framing structural parts and masonry works Cost for welfare work
- Construction of installing building equipment Cost for welfare work
- Construction of installing building equipment Cost for welfare work
- Electrical and communication works Cost for welfare work
- Electrical works Cost for welfare work
- Communication works Cost for welfare work
- Building completion and finishing Cost for welfare work
- Painting papering and finishing carpentry works Cost for welfare work
- Glazing works and joinery installation Cost for welfare work
- Other building completion and finishing Cost for welfare work
- Repair and maintenance works for construction works and supplementary facilities Cost for welfare work
- Construction Depreciation
- General construction Depreciation
- Building construction Depreciation
- Residential building construction Depreciation
- Non-residential building construction Depreciation
- Heavy and civil engineering construction Depreciation
- Land subdivision with land improvement Depreciation
- Construction of civil engineering projects Depreciation
- Specialized construction activities Depreciation
- Site preparation and construction of foundation works and structures Depreciation
- Site preparation and related construction Depreciation
- Erecting assembling and framing structural parts and masonry works Depreciation
- Other erecting assembling and framing structural parts and masonry works Depreciation
- Construction of installing building equipment Depreciation
- Construction of installing building equipment Depreciation
- Electrical and communication works Depreciation
- Electrical works Depreciation
- Communication works Depreciation
- Building completion and finishing Depreciation
- Painting papering and finishing carpentry works Depreciation
- Glazing works and joinery installation Depreciation
- Other building completion and finishing Depreciation
- Repair and maintenance works for construction works and supplementary facilities Depreciation
Construction Total
2008 253,551,6461000000won→2024 477,696,1411000000won▲ +88.4%
General construction Total
2008 157,802,0561000000won→2024 308,139,9091000000won▲ +95.3%
Building construction Total
2008 118,103,1621000000won→2024 254,958,3421000000won▲ +115.9%
Residential building construction Total
2008 75,143,1541000000won→2024 126,810,9231000000won▲ +68.8%
Non-residential building construction Total
2008 42,960,0071000000won→2024 128,147,4191000000won▲ +198.3%
Heavy and civil engineering construction Total
2008 39,698,8941000000won→2024 53,181,5671000000won▲ +34.0%
Land subdivision with land improvement Total
2008 1,942,9991000000won→2024 987,5531000000won▼ −49.2%
Construction of civil engineering projects Total
2008 37,755,8941000000won→2024 52,194,0141000000won▲ +38.2%
Specialized construction activities Total
2008 95,749,5901000000won→2024 169,556,2321000000won▲ +77.1%
Site preparation and construction of foundation works and structures Total
2008 39,706,2301000000won→2024 57,359,5361000000won▲ +44.5%
Site preparation and related construction Total
2008 12,402,0251000000won→2024 14,388,8061000000won▲ +16.0%
Erecting assembling and framing structural parts and masonry works Total
2008 16,945,6561000000won→2024 24,685,8361000000won▲ +45.7%
Other erecting assembling and framing structural parts and masonry works Total
2008 10,358,5471000000won→2024 18,284,8941000000won▲ +76.5%
Construction of installing building equipment Total
2008 14,620,5891000000won→2024 30,195,4731000000won▲ +106.5%
Construction of installing building equipment Total
2008 14,620,5891000000won→2024 30,195,4731000000won▲ +106.5%
Electrical and communication works Total
2008 19,109,9231000000won→2024 43,684,6791000000won▲ +128.6%
Electrical works Total
2008 12,899,5271000000won→2024 31,380,1341000000won▲ +143.3%
Communication works Total
2008 6,210,3961000000won→2024 12,304,5441000000won▲ +98.1%
Building completion and finishing Total
2008 21,103,3221000000won→2024 38,316,5441000000won▲ +81.6%
Painting papering and finishing carpentry works Total
2008 10,059,2741000000won→2024 18,481,5481000000won▲ +83.7%
Glazing works and joinery installation Total
2008 8,060,2441000000won→2024 13,949,4381000000won▲ +73.1%
Other building completion and finishing Total
2008 2,983,8041000000won→2024 5,885,5591000000won▲ +97.3%
Repair and maintenance works for construction works and supplementary facilities Total
2008 1,209,5241000000won→2022 1,070,2661000000won▼ −11.5%
Construction Raw material costs
2008 79,819,7331000000won→2024 127,946,6981000000won▲ +60.3%
General construction Raw material costs
2008 45,219,1601000000won→2024 70,393,7831000000won▲ +55.7%
Building construction Raw material costs
2008 31,505,5651000000won→2024 59,506,9061000000won▲ +88.9%
Residential building construction Raw material costs
2008 20,140,0201000000won→2024 29,789,6401000000won▲ +47.9%
Non-residential building construction Raw material costs
2008 11,365,5441000000won→2024 29,717,2661000000won▲ +161.5%
Heavy and civil engineering construction Raw material costs
2008 13,713,5951000000won→2024 10,886,8771000000won▼ −20.6%
Land subdivision with land improvement Raw material costs
2008 415,6021000000won→2024 144,4121000000won▼ −65.3%
Construction of civil engineering projects Raw material costs
2008 13,297,9921000000won→2024 10,742,4651000000won▼ −19.2%
Specialized construction activities Raw material costs
2008 34,600,5721000000won→2024 57,552,9141000000won▲ +66.3%
Site preparation and construction of foundation works and structures Raw material costs
2008 12,290,3871000000won→2024 14,393,5061000000won▲ +17.1%
Site preparation and related construction Raw material costs
2008 3,033,9531000000won→2024 3,050,5391000000won▲ +0.5%
Erecting assembling and framing structural parts and masonry works Raw material costs
2008 5,199,3131000000won→2024 5,610,0341000000won▲ +7.9%
Other erecting assembling and framing structural parts and masonry works Raw material costs
2008 4,057,1201000000won→2024 5,732,9331000000won▲ +41.3%
Construction of installing building equipment Raw material costs
2008 5,941,6781000000won→2024 11,593,7751000000won▲ +95.1%
Construction of installing building equipment Raw material costs
2008 5,941,6781000000won→2024 11,593,7751000000won▲ +95.1%
Electrical and communication works Raw material costs
2008 7,371,9871000000won→2024 16,386,1011000000won▲ +122.3%
Electrical works Raw material costs
2008 5,408,1871000000won→2024 11,745,7321000000won▲ +117.2%
Communication works Raw material costs
2008 1,963,8001000000won→2024 4,640,3691000000won▲ +136.3%
Building completion and finishing Raw material costs
2008 8,582,2891000000won→2024 15,179,5331000000won▲ +76.9%
Painting papering and finishing carpentry works Raw material costs
2008 3,908,4321000000won→2024 6,969,7991000000won▲ +78.3%
Glazing works and joinery installation Raw material costs
2008 3,624,6671000000won→2024 6,298,8311000000won▲ +73.8%
Other building completion and finishing Raw material costs
2008 1,049,1881000000won→2024 1,910,9031000000won▲ +82.1%
Repair and maintenance works for construction works and supplementary facilities Raw material costs
2008 414,2291000000won→2022 422,0431000000won▲ +1.9%
Construction Ancillary material costs
2008 2,475,5771000000won→2024 4,896,0691000000won▲ +97.8%
General construction Ancillary material costs
2008 850,7551000000won→2024 1,944,0691000000won▲ +128.5%
Building construction Ancillary material costs
2008 582,6601000000won→2024 1,438,6951000000won▲ +146.9%
Residential building construction Ancillary material costs
2008 238,9741000000won→2024 344,7791000000won▲ +44.3%
Non-residential building construction Ancillary material costs
2008 343,6861000000won→2024 1,093,9161000000won▲ +218.3%
Heavy and civil engineering construction Ancillary material costs
2008 268,0941000000won→2024 505,3741000000won▲ +88.5%
Land subdivision with land improvement Ancillary material costs
2008 16,6261000000won→2024 10,8411000000won▼ −34.8%
Construction of civil engineering projects Ancillary material costs
2008 251,4681000000won→2024 494,5331000000won▲ +96.7%
Specialized construction activities Ancillary material costs
2008 1,624,8221000000won→2024 2,952,0001000000won▲ +81.7%
Site preparation and construction of foundation works and structures Ancillary material costs
2008 745,7121000000won→2024 1,236,8681000000won▲ +65.9%
Site preparation and related construction Ancillary material costs
2008 254,4491000000won→2024 404,5121000000won▲ +59.0%
Erecting assembling and framing structural parts and masonry works Ancillary material costs
2008 313,0341000000won→2024 447,6761000000won▲ +43.0%
Other erecting assembling and framing structural parts and masonry works Ancillary material costs
2008 178,2281000000won→2024 384,6801000000won▲ +115.8%
Construction of installing building equipment Ancillary material costs
2008 222,8531000000won→2024 477,4971000000won▲ +114.3%
Construction of installing building equipment Ancillary material costs
2008 222,8531000000won→2024 477,4971000000won▲ +114.3%
Electrical and communication works Ancillary material costs
2008 340,3441000000won→2024 628,9271000000won▲ +84.8%
Electrical works Ancillary material costs
2008 235,2981000000won→2024 455,8481000000won▲ +93.7%
Communication works Ancillary material costs
2008 105,0451000000won→2024 173,0781000000won▲ +64.8%
Building completion and finishing Ancillary material costs
2008 292,2191000000won→2024 608,7091000000won▲ +108.3%
Painting papering and finishing carpentry works Ancillary material costs
2008 120,1011000000won→2024 264,5971000000won▲ +120.3%
Glazing works and joinery installation Ancillary material costs
2008 128,2321000000won→2024 243,7011000000won▲ +90.0%
Other building completion and finishing Ancillary material costs
2008 43,8851000000won→2024 100,4101000000won▲ +128.8%
Repair and maintenance works for construction works and supplementary facilities Ancillary material costs
2008 23,6921000000won→2022 21,1021000000won▼ −10.9%
Construction Labour cost
2008 39,837,1941000000won→2024 88,653,7231000000won▲ +122.5%
General construction Labour cost
2008 15,876,1931000000won→2024 37,397,9551000000won▲ +135.6%
Building construction Labour cost
2008 12,025,5401000000won→2024 27,707,3661000000won▲ +130.4%
Residential building construction Labour cost
2008 7,373,5341000000won→2024 10,741,4361000000won▲ +45.7%
Non-residential building construction Labour cost
2008 4,652,0061000000won→2024 16,965,9311000000won▲ +264.7%
Heavy and civil engineering construction Labour cost
2008 3,850,6531000000won→2024 9,690,5891000000won▲ +151.7%
Land subdivision with land improvement Labour cost
2008 244,1451000000won→2024 182,8251000000won▼ −25.1%
Construction of civil engineering projects Labour cost
2008 3,606,5071000000won→2024 9,507,7641000000won▲ +163.6%
Specialized construction activities Labour cost
2008 23,961,0011000000won→2024 51,255,7681000000won▲ +113.9%
Site preparation and construction of foundation works and structures Labour cost
2008 9,403,9711000000won→2024 18,852,4681000000won▲ +100.5%
Site preparation and related construction Labour cost
2008 2,437,9871000000won→2024 3,559,0231000000won▲ +46.0%
Erecting assembling and framing structural parts and masonry works Labour cost
2008 4,803,3011000000won→2024 10,037,5751000000won▲ +109.0%
Other erecting assembling and framing structural parts and masonry works Labour cost
2008 2,162,6811000000won→2024 5,255,8701000000won▲ +143.0%
Construction of installing building equipment Labour cost
2008 3,607,7311000000won→2024 9,359,4201000000won▲ +159.4%
Construction of installing building equipment Labour cost
2008 3,607,7311000000won→2024 9,359,4201000000won▲ +159.4%
Electrical and communication works Labour cost
2008 5,747,9621000000won→2024 12,663,1691000000won▲ +120.3%
Electrical works Labour cost
2008 4,029,6071000000won→2024 9,700,4201000000won▲ +140.7%
Communication works Labour cost
2008 1,718,3541000000won→2024 2,962,7501000000won▲ +72.4%
Building completion and finishing Labour cost
2008 4,875,1261000000won→2024 10,380,7101000000won▲ +112.9%
Painting papering and finishing carpentry works Labour cost
2008 2,246,7291000000won→2024 5,053,4161000000won▲ +124.9%
Glazing works and joinery installation Labour cost
2008 1,641,4481000000won→2024 3,172,5581000000won▲ +93.3%
Other building completion and finishing Labour cost
2008 986,9481000000won→2024 2,154,7361000000won▲ +118.3%
Repair and maintenance works for construction works and supplementary facilities Labour cost
2008 326,2091000000won→2022 263,6171000000won▼ −19.2%
Construction Cost for welfare work
2008 5,110,2681000000won→2024 14,710,2281000000won▲ +187.9%
General construction Cost for welfare work
2008 2,317,6241000000won→2024 7,925,5401000000won▲ +242.0%
Building construction Cost for welfare work
2008 1,661,6351000000won→2024 6,275,2341000000won▲ +277.7%
Residential building construction Cost for welfare work
2008 990,2321000000won→2024 2,889,8981000000won▲ +191.8%
Non-residential building construction Cost for welfare work
2008 671,4021000000won→2024 3,385,3361000000won▲ +404.2%
Heavy and civil engineering construction Cost for welfare work
2008 655,9881000000won→2024 1,650,3061000000won▲ +151.6%
Land subdivision with land improvement Cost for welfare work
2008 36,4441000000won→2024 32,3071000000won▼ −11.4%
Construction of civil engineering projects Cost for welfare work
2008 619,5441000000won→2024 1,617,9981000000won▲ +161.2%
Specialized construction activities Cost for welfare work
2008 2,792,6441000000won→2024 6,784,6881000000won▲ +142.9%
Site preparation and construction of foundation works and structures Cost for welfare work
2008 1,211,7681000000won→2024 2,445,1301000000won▲ +101.8%
Site preparation and related construction Cost for welfare work
2008 375,1601000000won→2024 550,1951000000won▲ +46.7%
Erecting assembling and framing structural parts and masonry works Cost for welfare work
2008 566,2051000000won→2024 1,174,0131000000won▲ +107.3%
Other erecting assembling and framing structural parts and masonry works Cost for welfare work
2008 270,4031000000won→2024 720,9221000000won▲ +166.6%
Construction of installing building equipment Cost for welfare work
2008 390,4711000000won→2024 1,285,6521000000won▲ +229.3%
Construction of installing building equipment Cost for welfare work
2008 390,4711000000won→2024 1,285,6521000000won▲ +229.3%
Electrical and communication works Cost for welfare work
2008 630,5781000000won→2024 1,801,4701000000won▲ +185.7%
Electrical works Cost for welfare work
2008 450,3161000000won→2024 1,393,0391000000won▲ +209.3%
Communication works Cost for welfare work
2008 180,2621000000won→2024 408,4311000000won▲ +126.6%
Building completion and finishing Cost for welfare work
2008 528,1771000000won→2024 1,252,4361000000won▲ +137.1%
Painting papering and finishing carpentry works Cost for welfare work
2008 240,9401000000won→2024 597,3361000000won▲ +147.9%
Glazing works and joinery installation Cost for welfare work
2008 186,5841000000won→2024 414,9901000000won▲ +122.4%
Other building completion and finishing Cost for welfare work
2008 100,6521000000won→2024 240,1101000000won▲ +138.6%
Repair and maintenance works for construction works and supplementary facilities Cost for welfare work
2008 31,6471000000won→2022 36,6431000000won▲ +15.8%
Construction Depreciation
2008 1,495,7761000000won→2024 3,352,1211000000won▲ +124.1%
General construction Depreciation
2008 618,7701000000won→2024 1,626,7791000000won▲ +162.9%
Building construction Depreciation
2008 337,5681000000won→2024 1,216,5731000000won▲ +260.4%
Residential building construction Depreciation
2008 161,1321000000won→2024 590,1451000000won▲ +266.2%
Non-residential building construction Depreciation
2008 176,4351000000won→2024 626,4281000000won▲ +255.0%
Heavy and civil engineering construction Depreciation
2008 281,2021000000won→2024 410,2061000000won▲ +45.9%
Land subdivision with land improvement Depreciation
2008 8,6901000000won→2024 6,3911000000won▼ −26.5%
Construction of civil engineering projects Depreciation
2008 272,5111000000won→2024 403,8151000000won▲ +48.2%
Specialized construction activities Depreciation
2008 877,0061000000won→2024 1,725,3421000000won▲ +96.7%
Site preparation and construction of foundation works and structures Depreciation
2008 374,7191000000won→2024 579,5241000000won▲ +54.7%
Site preparation and related construction Depreciation
2008 120,1241000000won→2024 155,1241000000won▲ +29.1%
Erecting assembling and framing structural parts and masonry works Depreciation
2008 147,8271000000won→2024 184,9761000000won▲ +25.1%
Other erecting assembling and framing structural parts and masonry works Depreciation
2008 106,7671000000won→2024 239,4241000000won▲ +124.2%
Construction of installing building equipment Depreciation
2008 107,5491000000won→2024 277,3831000000won▲ +157.9%
Construction of installing building equipment Depreciation
2008 107,5491000000won→2024 277,3831000000won▲ +157.9%
Electrical and communication works Depreciation
2008 240,2711000000won→2024 570,6421000000won▲ +137.5%
Electrical works Depreciation
2008 132,3111000000won→2024 399,6001000000won▲ +202.0%
Communication works Depreciation
2008 107,9601000000won→2024 171,0421000000won▲ +58.4%
Building completion and finishing Depreciation
2008 146,5701000000won→2024 297,7941000000won▲ +103.2%
Painting papering and finishing carpentry works Depreciation
2008 63,4231000000won→2024 120,9101000000won▲ +90.6%
Glazing works and joinery installation Depreciation
2008 63,3661000000won→2024 138,4851000000won▲ +118.5%
Other building completion and finishing Depreciation
2008 19,7801000000won→2024 38,3991000000won▲ +94.1%
Repair and maintenance works for construction works and supplementary facilities Depreciation
2008 7,8941000000won→2022 9,6811000000won▲ +22.6%
Data source
- Organization
- 통계청
- Dataset
- 산업세분류 및 조직형태별 총괄
- Provider
- KOSIS 국가통계포털
- Period
- 2008 ~ 2024
- As of
- 2026-08-29
- Processing
- KOSIS OpenAPI 로 연간 전국값을 받아 그대로 사용. 가공 없음.
Other surveys in this category
- Construction Industry Survey1 tables · 102 items
- Construction Business Trend Survey13 tables · 159 items
- Building Permit, Start and Completion Statistics4 tables · 26 items
- Building Statistics1 tables · 113 items
- Urban Redevelopment Project Status5 tables · 26 items
- Overseas Construction Orders Statistics3 tables · 78 items