2 tables and 200 items from the KOSIS survey “Construction Industry Survey”, as annual figures and charts.
공사종류/등록업종별 계약액,기성액,원도급 및 하도급공사 기성액,미기성액
Back to top공사종류별 총계 · 등록업종별 합 계
- Value of orders received in original contract
- Building construction Value of orders received in original contract
- Detached & tenement house Value of orders received in original contract
- Apartment Value of orders received in original contract
- Residential shop Value of orders received in original contract
- Market department store Value of orders received in original contract
- Business building Value of orders received in original contract
- Public building Value of orders received in original contract
- Hotel & lodgings Value of orders received in original contract
- Educational facilities Value of orders received in original contract
- Hospital Value of orders received in original contract
- Church & temple Value of orders received in original contract
- Traditional style & Cultural building Value of orders received in original contract
- Public & Performance Value of orders received in original contract
- Stadium & playground Value of orders received in original contract
- Exhibition pavilion Value of orders received in original contract
- Factory & workshop Value of orders received in original contract
- Machine installation (except plant) Value of orders received in original contract
- Substation power plant Value of orders received in original contract
- Warehouse garage terminal building Value of orders received in original contract
- Hazardous property storehouse Value of orders received in original contract
- Other Building Facilities Value of orders received in original contract
- Civil engineering Value of orders received in original contract
- General road Value of orders received in original contract
- Value of construction completed
- Building construction Value of construction completed
- Detached & tenement house Value of construction completed
- Apartment Value of construction completed
- Residential shop Value of construction completed
- Market department store Value of construction completed
- Business building Value of construction completed
- Public building Value of construction completed
- Hotel & lodgings Value of construction completed
- Educational facilities Value of construction completed
- Hospital Value of construction completed
- Church & temple Value of construction completed
- Traditional style & Cultural building Value of construction completed
- Public & Performance Value of construction completed
- Stadium & playground Value of construction completed
- Exhibition pavilion Value of construction completed
- Factory & workshop Value of construction completed
- Machine installation (except plant) Value of construction completed
- Substation power plant Value of construction completed
- Warehouse garage terminal building Value of construction completed
- Hazardous property storehouse Value of construction completed
- Other Building Facilities Value of construction completed
- Civil engineering Value of construction completed
- General road Value of construction completed
- Value of construction completed in original contract
- Building construction Value of construction completed in original contract
- Detached & tenement house Value of construction completed in original contract
- Apartment Value of construction completed in original contract
- Residential shop Value of construction completed in original contract
- Market department store Value of construction completed in original contract
- Business building Value of construction completed in original contract
- Public building Value of construction completed in original contract
- Hotel & lodgings Value of construction completed in original contract
- Educational facilities Value of construction completed in original contract
- Hospital Value of construction completed in original contract
- Church & temple Value of construction completed in original contract
- Traditional style & Cultural building Value of construction completed in original contract
- Public & Performance Value of construction completed in original contract
- Stadium & playground Value of construction completed in original contract
- Exhibition pavilion Value of construction completed in original contract
- Factory & workshop Value of construction completed in original contract
- Machine installation (except plant) Value of construction completed in original contract
- Substation power plant Value of construction completed in original contract
- Warehouse garage terminal building Value of construction completed in original contract
- Hazardous property storehouse Value of construction completed in original contract
- Other Building Facilities Value of construction completed in original contract
- Civil engineering Value of construction completed in original contract
- General road Value of construction completed in original contract
- Value of construction completed in subcontract
- Building construction Value of construction completed in subcontract
- Detached & tenement house Value of construction completed in subcontract
- Apartment Value of construction completed in subcontract
- Residential shop Value of construction completed in subcontract
- Market department store Value of construction completed in subcontract
- Business building Value of construction completed in subcontract
- Public building Value of construction completed in subcontract
- Hotel & lodgings Value of construction completed in subcontract
- Educational facilities Value of construction completed in subcontract
- Hospital Value of construction completed in subcontract
- Church & temple Value of construction completed in subcontract
- Traditional style & Cultural building Value of construction completed in subcontract
- Public & Performance Value of construction completed in subcontract
- Stadium & playground Value of construction completed in subcontract
- Exhibition pavilion Value of construction completed in subcontract
- Factory & workshop Value of construction completed in subcontract
- Machine installation (except plant) Value of construction completed in subcontract
- Substation power plant Value of construction completed in subcontract
- Warehouse garage terminal building Value of construction completed in subcontract
- Hazardous property storehouse Value of construction completed in subcontract
- Other Building Facilities Value of construction completed in subcontract
- Civil engineering Value of construction completed in subcontract
- General road Value of construction completed in subcontract
- Value of carry-over work
- Building construction Value of carry-over work
- Detached & tenement house Value of carry-over work
- Apartment Value of carry-over work
- Residential shop Value of carry-over work
- Market department store Value of carry-over work
- Business building Value of carry-over work
- Public building Value of carry-over work
- Hotel & lodgings Value of carry-over work
- Educational facilities Value of carry-over work
- Hospital Value of carry-over work
- Church & temple Value of carry-over work
- Traditional style & Cultural building Value of carry-over work
- Public & Performance Value of carry-over work
- Stadium & playground Value of carry-over work
- Exhibition pavilion Value of carry-over work
- Factory & workshop Value of carry-over work
- Machine installation (except plant) Value of carry-over work
- Substation power plant Value of carry-over work
- Warehouse garage terminal building Value of carry-over work
- Hazardous property storehouse Value of carry-over work
- Other Building Facilities Value of carry-over work
- Civil engineering Value of carry-over work
- General road Value of carry-over work
Value of orders received in original contract
2013 241,983,308Mill. Won→2023 297,517,147Mill. Won▲ +22.9%
Building construction Value of orders received in original contract
2013 124,654,476Mill. Won→2023 174,099,903Mill. Won▲ +39.7%
Detached & tenement house Value of orders received in original contract
2013 4,434,164Mill. Won→2023 8,726,655Mill. Won▲ +96.8%
Apartment Value of orders received in original contract
2013 36,545,175Mill. Won→2023 52,872,302Mill. Won▲ +44.7%
Residential shop Value of orders received in original contract
2013 6,931,337Mill. Won→2023 9,078,621Mill. Won▲ +31.0%
Market department store Value of orders received in original contract
2013 7,193,965Mill. Won→2023 5,178,811Mill. Won▼ −28.0%
Business building Value of orders received in original contract
2013 13,353,344Mill. Won→2023 21,844,734Mill. Won▲ +63.6%
Public building Value of orders received in original contract
2013 6,876,036Mill. Won→2023 6,925,217Mill. Won▲ +0.7%
Hotel & lodgings Value of orders received in original contract
2013 3,482,720Mill. Won→2023 4,057,241Mill. Won▲ +16.5%
Educational facilities Value of orders received in original contract
2013 6,953,003Mill. Won→2023 10,822,183Mill. Won▲ +55.6%
Hospital Value of orders received in original contract
2013 2,050,408Mill. Won→2023 2,221,417Mill. Won▲ +8.3%
Church & temple Value of orders received in original contract
2013 1,706,561Mill. Won→2023 1,167,189Mill. Won▼ −31.6%
Traditional style & Cultural building Value of orders received in original contract
2013 111,083Mill. Won→2023 105,653Mill. Won▼ −4.9%
Public & Performance Value of orders received in original contract
2013 732,944Mill. Won→2023 594,233Mill. Won▼ −18.9%
Stadium & playground Value of orders received in original contract
2013 1,274,776Mill. Won→2023 1,084,455Mill. Won▼ −14.9%
Exhibition pavilion Value of orders received in original contract
2013 1,302,444Mill. Won→2023 735,288Mill. Won▼ −43.5%
Factory & workshop Value of orders received in original contract
2013 19,472,049Mill. Won→2023 31,676,537Mill. Won▲ +62.7%
Machine installation (except plant) Value of orders received in original contract
2013 108,162Mill. Won→2023 347,442Mill. Won▲ +221.2%
Substation power plant Value of orders received in original contract
2013 1,363,888Mill. Won→2023 329,284Mill. Won▼ −75.9%
Warehouse garage terminal building Value of orders received in original contract
2013 4,085,864Mill. Won→2023 5,882,509Mill. Won▲ +44.0%
Hazardous property storehouse Value of orders received in original contract
2013 216,693Mill. Won→2023 246,701Mill. Won▲ +13.8%
Other Building Facilities Value of orders received in original contract
2013 6,459,849Mill. Won→2023 10,203,431Mill. Won▲ +58.0%
Civil engineering Value of orders received in original contract
2013 55,945,431Mill. Won→2023 52,973,943Mill. Won▼ −5.3%
General road Value of orders received in original contract
2013 7,446,924Mill. Won→2023 8,132,734Mill. Won▲ +9.2%
Value of construction completed
2008 211,555,501Million Won→2023 359,180,313Million Won▲ +69.8%
Building construction Value of construction completed
2008 114,631,733Million Won→2023 252,602,425Million Won▲ +120.4%
Detached & tenement house Value of construction completed
2008 1,743,318Million Won→2023 6,610,583Million Won▲ +279.2%
Apartment Value of construction completed
2008 43,274,965Million Won→2023 82,861,648Million Won▲ +91.5%
Residential shop Value of construction completed
2008 4,989,515Million Won→2023 17,764,612Million Won▲ +256.0%
Market department store Value of construction completed
2008 5,411,710Million Won→2023 5,965,471Million Won▲ +10.2%
Business building Value of construction completed
2008 7,583,872Million Won→2023 32,329,653Million Won▲ +326.3%
Public building Value of construction completed
2008 3,852,131Million Won→2023 8,107,984Million Won▲ +110.5%
Hotel & lodgings Value of construction completed
2008 3,177,521Million Won→2023 6,656,737Million Won▲ +109.5%
Educational facilities Value of construction completed
2008 7,391,690Million Won→2023 9,567,415Million Won▲ +29.4%
Hospital Value of construction completed
2008 2,109,255Million Won→2023 3,060,676Million Won▲ +45.1%
Church & temple Value of construction completed
2008 1,066,960Million Won→2023 1,338,928Million Won▲ +25.5%
Traditional style & Cultural building Value of construction completed
2008 132,389Million Won→2023 74,073Million Won▼ −44.0%
Public & Performance Value of construction completed
2008 684,679Million Won→2023 672,969Million Won▼ −1.7%
Stadium & playground Value of construction completed
2008 1,040,378Million Won→2023 1,712,381Million Won▲ +64.6%
Exhibition pavilion Value of construction completed
2008 1,045,906Million Won→2023 784,438Million Won▼ −25.0%
Factory & workshop Value of construction completed
2008 15,053,892Million Won→2023 48,940,441Million Won▲ +225.1%
Machine installation (except plant) Value of construction completed
2008 1,102,162Million Won→2023 613,174Million Won▼ −44.4%
Substation power plant Value of construction completed
2008 1,277,190Million Won→2023 601,686Million Won▼ −52.9%
Warehouse garage terminal building Value of construction completed
2008 2,256,155Million Won→2023 15,309,199Million Won▲ +578.6%
Hazardous property storehouse Value of construction completed
2008 219,728Million Won→2023 276,813Million Won▲ +26.0%
Other Building Facilities Value of construction completed
2008 11,218,307Million Won→2023 9,353,545Million Won▼ −16.6%
Civil engineering Value of construction completed
2008 59,429,142Million Won→2023 50,697,940Million Won▼ −14.7%
General road Value of construction completed
2008 8,247,953Million Won→2023 7,373,668Million Won▼ −10.6%
Value of construction completed in original contract
2008 145,571,069Million Won→2023 235,503,936Million Won▲ +61.8%
Building construction Value of construction completed in original contract
2008 75,780,877Million Won→2023 157,027,051Million Won▲ +107.2%
Detached & tenement house Value of construction completed in original contract
2008 1,324,610Million Won→2023 4,652,156Million Won▲ +251.2%
Apartment Value of construction completed in original contract
2008 27,790,189Million Won→2023 45,879,898Million Won▲ +65.1%
Residential shop Value of construction completed in original contract
2008 3,440,421Million Won→2023 10,840,786Million Won▲ +215.1%
Market department store Value of construction completed in original contract
2008 3,901,676Million Won→2023 4,243,702Million Won▲ +8.8%
Business building Value of construction completed in original contract
2008 5,350,693Million Won→2023 18,555,353Million Won▲ +246.8%
Public building Value of construction completed in original contract
2008 2,584,479Million Won→2023 5,735,047Million Won▲ +121.9%
Hotel & lodgings Value of construction completed in original contract
2008 2,247,182Million Won→2023 3,760,501Million Won▲ +67.3%
Educational facilities Value of construction completed in original contract
2008 4,606,299Million Won→2023 7,384,934Million Won▲ +60.3%
Hospital Value of construction completed in original contract
2008 1,304,144Million Won→2023 2,046,652Million Won▲ +56.9%
Church & temple Value of construction completed in original contract
2008 654,611Million Won→2023 804,318Million Won▲ +22.9%
Traditional style & Cultural building Value of construction completed in original contract
2008 91,190Million Won→2023 61,264Million Won▼ −32.8%
Public & Performance Value of construction completed in original contract
2008 451,257Million Won→2023 478,099Million Won▲ +5.9%
Stadium & playground Value of construction completed in original contract
2008 565,458Million Won→2023 1,169,989Million Won▲ +106.9%
Exhibition pavilion Value of construction completed in original contract
2008 783,343Million Won→2023 544,738Million Won▼ −30.5%
Factory & workshop Value of construction completed in original contract
2008 9,983,085Million Won→2023 34,125,508Million Won▲ +241.8%
Machine installation (except plant) Value of construction completed in original contract
2008 775,965Million Won→2023 332,434Million Won▼ −57.2%
Substation power plant Value of construction completed in original contract
2008 970,256Million Won→2023 401,744Million Won▼ −58.6%
Warehouse garage terminal building Value of construction completed in original contract
2008 1,546,313Million Won→2023 8,516,027Million Won▲ +450.7%
Hazardous property storehouse Value of construction completed in original contract
2008 168,077Million Won→2023 188,922Million Won▲ +12.4%
Other Building Facilities Value of construction completed in original contract
2008 7,241,617Million Won→2023 7,304,977Million Won▲ +0.9%
Civil engineering Value of construction completed in original contract
2008 39,253,817Million Won→2023 36,204,238Million Won▼ −7.8%
General road Value of construction completed in original contract
2008 5,440,168Million Won→2023 5,804,393Million Won▲ +6.7%
Value of construction completed in subcontract
2008 65,984,431Million Won→2023 123,676,377Million Won▲ +87.4%
Building construction Value of construction completed in subcontract
2008 38,850,855Million Won→2023 95,575,375Million Won▲ +146.0%
Detached & tenement house Value of construction completed in subcontract
2008 418,707Million Won→2023 1,958,427Million Won▲ +367.7%
Apartment Value of construction completed in subcontract
2008 15,484,775Million Won→2023 36,981,749Million Won▲ +138.8%
Residential shop Value of construction completed in subcontract
2008 1,549,094Million Won→2023 6,923,826Million Won▲ +347.0%
Market department store Value of construction completed in subcontract
2008 1,510,034Million Won→2023 1,721,769Million Won▲ +14.0%
Business building Value of construction completed in subcontract
2008 2,233,179Million Won→2023 13,774,300Million Won▲ +516.8%
Public building Value of construction completed in subcontract
2008 1,267,652Million Won→2023 2,372,938Million Won▲ +87.2%
Hotel & lodgings Value of construction completed in subcontract
2008 930,338Million Won→2023 2,896,236Million Won▲ +211.3%
Educational facilities Value of construction completed in subcontract
2008 2,785,390Million Won→2023 2,182,480Million Won▼ −21.6%
Hospital Value of construction completed in subcontract
2008 805,111Million Won→2023 1,014,025Million Won▲ +25.9%
Church & temple Value of construction completed in subcontract
2008 412,348Million Won→2023 534,611Million Won▲ +29.7%
Traditional style & Cultural building Value of construction completed in subcontract
2008 41,198Million Won→2023 12,809Million Won▼ −68.9%
Public & Performance Value of construction completed in subcontract
2008 233,421Million Won→2023 194,870Million Won▼ −16.5%
Stadium & playground Value of construction completed in subcontract
2008 474,920Million Won→2023 542,392Million Won▲ +14.2%
Exhibition pavilion Value of construction completed in subcontract
2008 262,562Million Won→2023 239,700Million Won▼ −8.7%
Factory & workshop Value of construction completed in subcontract
2008 5,070,807Million Won→2023 14,814,932Million Won▲ +192.2%
Machine installation (except plant) Value of construction completed in subcontract
2008 326,196Million Won→2023 280,740Million Won▼ −13.9%
Substation power plant Value of construction completed in subcontract
2008 306,933Million Won→2023 199,942Million Won▼ −34.9%
Warehouse garage terminal building Value of construction completed in subcontract
2008 709,841Million Won→2023 6,793,171Million Won▲ +857.0%
Hazardous property storehouse Value of construction completed in subcontract
2008 51,651Million Won→2023 87,891Million Won▲ +70.2%
Other Building Facilities Value of construction completed in subcontract
2008 3,976,689Million Won→2023 2,048,568Million Won▼ −48.5%
Civil engineering Value of construction completed in subcontract
2008 20,175,325Million Won→2023 14,493,702Million Won▼ −28.2%
General road Value of construction completed in subcontract
2008 2,807,785Million Won→2023 1,569,274Million Won▼ −44.1%
Value of carry-over work
2008 422,303,556Million Won→2023 779,614,693Million Won▲ +84.6%
Building construction Value of carry-over work
2008 218,991,147Million Won→2023 539,547,459Million Won▲ +146.4%
Detached & tenement house Value of carry-over work
2008 2,792,139Million Won→2023 9,054,363Million Won▲ +224.3%
Apartment Value of carry-over work
2008 115,179,446Million Won→2023 327,939,253Million Won▲ +184.7%
Residential shop Value of carry-over work
2008 16,260,222Million Won→2023 36,743,816Million Won▲ +126.0%
Market department store Value of carry-over work
2008 8,093,928Million Won→2023 4,570,828Million Won▼ −43.5%
Business building Value of carry-over work
2008 13,273,576Million Won→2023 52,015,577Million Won▲ +291.9%
Public building Value of carry-over work
2008 3,547,037Million Won→2023 6,446,797Million Won▲ +81.8%
Hotel & lodgings Value of carry-over work
2008 6,901,697Million Won→2023 12,579,528Million Won▲ +82.3%
Educational facilities Value of carry-over work
2008 7,694,399Million Won→2023 7,283,474Million Won▼ −5.3%
Hospital Value of carry-over work
2008 3,189,216Million Won→2023 3,820,452Million Won▲ +19.8%
Church & temple Value of carry-over work
2008 1,621,719Million Won→2023 1,337,416Million Won▼ −17.5%
Traditional style & Cultural building Value of carry-over work
2008 141,960Million Won→2023 89,440Million Won▼ −37.0%
Public & Performance Value of carry-over work
2008 1,021,674Million Won→2023 1,002,568Million Won▼ −1.9%
Stadium & playground Value of carry-over work
2008 1,292,494Million Won→2023 1,417,316Million Won▲ +9.7%
Exhibition pavilion Value of carry-over work
2008 1,288,696Million Won→2023 561,135Million Won▼ −56.5%
Factory & workshop Value of carry-over work
2008 12,327,201Million Won→2023 48,941,592Million Won▲ +297.0%
Machine installation (except plant) Value of carry-over work
2008 3,391,197Million Won→2023 320,341Million Won▼ −90.6%
Substation power plant Value of carry-over work
2008 3,111,736Million Won→2023 662,257Million Won▼ −78.7%
Warehouse garage terminal building Value of carry-over work
2008 3,816,084Million Won→2023 16,547,931Million Won▲ +333.6%
Hazardous property storehouse Value of carry-over work
2008 169,112Million Won→2023 167,391Million Won▼ −1.0%
Other Building Facilities Value of carry-over work
2008 13,877,604Million Won→2023 8,045,985Million Won▼ −42.0%
Civil engineering Value of carry-over work
2008 123,280,333Million Won→2023 102,449,620Million Won▼ −16.9%
General road Value of carry-over work
2008 20,150,872Million Won→2023 9,141,164Million Won▼ −54.6%
등록업종/발주자별 계약액,기성액,원도급 및 하도급공사 기성액,미기성액
Back to top등록업종별 합 계 · 발주자별 총계
- Total Value of orders received in original contract
- General construction Value of orders received in original contract
- Special construction Value of orders received in original contract
- Excavating and earthmoving Value of orders received in original contract
- Pavement Value of orders received in original contract
- Boring & grouting works Value of orders received in original contract
- Interior architecture works Value of orders received in original contract
- Metal structure installation and Erection of doors and Greenhouse construction Value of orders received in original contract
- Roofing sheet metal prefabrication Value of orders received in original contract
- Painting works Value of orders received in original contract
- Plastering waterproofing construction business Value of orders received in original contract
- Stone works Value of orders received in original contract
- Landscape Planting Works Value of orders received in original contract
- Landscape Works Facility Value of orders received in original contract
- Steel Reinforcing and Reinforced Concrete Works Value of orders received in original contract
- Scaffolding demolition works Value of orders received in original contract
- Total Value of construction completed
- General construction Value of construction completed
- Special construction Value of construction completed
- Excavating and earthmoving Value of construction completed
- Pavement Value of construction completed
- Boring & grouting works Value of construction completed
- Interior architecture works Value of construction completed
- Metal structure installation and Erection of doors and Greenhouse construction Value of construction completed
- Roofing sheet metal prefabrication Value of construction completed
- Painting works Value of construction completed
- Plastering waterproofing construction business Value of construction completed
- Stone works Value of construction completed
- Landscape Planting Works Value of construction completed
- Landscape Works Facility Value of construction completed
- Steel Reinforcing and Reinforced Concrete Works Value of construction completed
- Scaffolding demolition works Value of construction completed
- Total Value of construction completed in original contract
- General construction Value of construction completed in original contract
- Special construction Value of construction completed in original contract
- Excavating and earthmoving Value of construction completed in original contract
- Pavement Value of construction completed in original contract
- Boring & grouting works Value of construction completed in original contract
- Interior architecture works Value of construction completed in original contract
- Metal structure installation and Erection of doors and Greenhouse construction Value of construction completed in original contract
- Roofing sheet metal prefabrication Value of construction completed in original contract
- Painting works Value of construction completed in original contract
- Plastering waterproofing construction business Value of construction completed in original contract
- Stone works Value of construction completed in original contract
- Landscape Planting Works Value of construction completed in original contract
- Landscape Works Facility Value of construction completed in original contract
- Steel Reinforcing and Reinforced Concrete Works Value of construction completed in original contract
- Scaffolding demolition works Value of construction completed in original contract
- Total Value of construction completed in subcontract
- General construction Value of construction completed in subcontract
- Special construction Value of construction completed in subcontract
- Excavating and earthmoving Value of construction completed in subcontract
- Pavement Value of construction completed in subcontract
- Boring & grouting works Value of construction completed in subcontract
- Interior architecture works Value of construction completed in subcontract
- Metal structure installation and Erection of doors and Greenhouse construction Value of construction completed in subcontract
- Roofing sheet metal prefabrication Value of construction completed in subcontract
- Painting works Value of construction completed in subcontract
- Plastering waterproofing construction business Value of construction completed in subcontract
- Stone works Value of construction completed in subcontract
- Landscape Planting Works Value of construction completed in subcontract
- Landscape Works Facility Value of construction completed in subcontract
- Steel Reinforcing and Reinforced Concrete Works Value of construction completed in subcontract
- Scaffolding demolition works Value of construction completed in subcontract
- Total Value of carry-over work
- General construction Value of carry-over work
- Special construction Value of carry-over work
- Excavating and earthmoving Value of carry-over work
- Pavement Value of carry-over work
- Boring & grouting works Value of carry-over work
- Interior architecture works Value of carry-over work
- Metal structure installation and Erection of doors and Greenhouse construction Value of carry-over work
- Roofing sheet metal prefabrication Value of carry-over work
- Painting works Value of carry-over work
- Plastering waterproofing construction business Value of carry-over work
- Stone works Value of carry-over work
- Landscape Planting Works Value of carry-over work
- Landscape Works Facility Value of carry-over work
- Steel Reinforcing and Reinforced Concrete Works Value of carry-over work
- Scaffolding demolition works Value of carry-over work
Total Value of orders received in original contract
2013 241,983,308Mill. Won→2023 297,517,147Mill. Won▲ +22.9%
General construction Value of orders received in original contract
2013 187,368,286Mill. Won→2023 211,176,877Mill. Won▲ +12.7%
Special construction Value of orders received in original contract
2013 23,728,451Mill. Won→2023 35,365,620Mill. Won▲ +49.0%
Excavating and earthmoving Value of orders received in original contract
2013 853,778Mill. Won→2023 1,285,736Mill. Won▲ +50.6%
Pavement Value of orders received in original contract
2013 774,471Mill. Won→2023 1,962,773Mill. Won▲ +153.4%
Boring & grouting works Value of orders received in original contract
2013 114,360Mill. Won→2023 155,217Mill. Won▲ +35.7%
Interior architecture works Value of orders received in original contract
2013 4,281,874Mill. Won→2023 7,658,409Mill. Won▲ +78.9%
Metal structure installation and Erection of doors and Greenhouse construction Value of orders received in original contract
2013 1,767,647Mill. Won→2023 2,457,392Mill. Won▲ +39.0%
Roofing sheet metal prefabrication Value of orders received in original contract
2013 312,950Mill. Won→2023 251,842Mill. Won▼ −19.5%
Painting works Value of orders received in original contract
2013 607,724Mill. Won→2023 1,364,693Mill. Won▲ +124.6%
Plastering waterproofing construction business Value of orders received in original contract
2013 481,925Mill. Won→2023 1,158,468Mill. Won▲ +140.4%
Stone works Value of orders received in original contract
2013 413,354Mill. Won→2023 497,038Mill. Won▲ +20.2%
Landscape Planting Works Value of orders received in original contract
2013 687,099Mill. Won→2023 1,455,909Mill. Won▲ +111.9%
Landscape Works Facility Value of orders received in original contract
2013 328,645Mill. Won→2023 865,847Mill. Won▲ +163.5%
Steel Reinforcing and Reinforced Concrete Works Value of orders received in original contract
2013 1,658,166Mill. Won→2023 2,527,758Mill. Won▲ +52.4%
Scaffolding demolition works Value of orders received in original contract
2013 356,174Mill. Won→2023 932,536Mill. Won▲ +161.8%
Total Value of construction completed
2008 211,555,501Million Won→2023 359,180,313Million Won▲ +69.8%
General construction Value of construction completed
2008 103,920,051Million Won→2023 158,917,688Million Won▲ +52.9%
Special construction Value of construction completed
2008 76,084,130Million Won→2023 134,987,294Million Won▲ +77.4%
Excavating and earthmoving Value of construction completed
2008 11,026,169Million Won→2023 14,985,890Million Won▲ +35.9%
Pavement Value of construction completed
2008 1,313,581Million Won→2023 2,798,406Million Won▲ +113.0%
Boring & grouting works Value of construction completed
2008 886,380Million Won→2023 2,084,470Million Won▲ +135.2%
Interior architecture works Value of construction completed
2008 7,726,928Million Won→2023 15,369,637Million Won▲ +98.9%
Metal structure installation and Erection of doors and Greenhouse construction Value of construction completed
2008 6,468,208Million Won→2023 11,459,184Million Won▲ +77.2%
Roofing sheet metal prefabrication Value of construction completed
2008 1,175,898Million Won→2023 3,236,400Million Won▲ +175.2%
Painting works Value of construction completed
2008 1,319,655Million Won→2023 2,857,281Million Won▲ +116.5%
Plastering waterproofing construction business Value of construction completed
2008 2,822,697Million Won→2023 6,150,180Million Won▲ +117.9%
Stone works Value of construction completed
2008 1,936,706Million Won→2023 2,613,918Million Won▲ +35.0%
Landscape Planting Works Value of construction completed
2008 2,091,904Million Won→2023 2,972,982Million Won▲ +42.1%
Landscape Works Facility Value of construction completed
2008 1,340,946Million Won→2023 2,043,500Million Won▲ +52.4%
Steel Reinforcing and Reinforced Concrete Works Value of construction completed
2008 13,086,099Million Won→2023 26,925,181Million Won▲ +105.8%
Scaffolding demolition works Value of construction completed
2008 1,540,198Million Won→2023 2,847,847Million Won▲ +84.9%
Total Value of construction completed in original contract
2008 145,571,069Million Won→2023 235,503,936Million Won▲ +61.8%
General construction Value of construction completed in original contract
2008 101,082,144Million Won→2023 153,283,255Million Won▲ +51.6%
Special construction Value of construction completed in original contract
2008 19,289,575Million Won→2023 35,306,798Million Won▲ +83.0%
Excavating and earthmoving Value of construction completed in original contract
2008 723,339Million Won→2023 1,236,962Million Won▲ +71.0%
Pavement Value of construction completed in original contract
2008 526,350Million Won→2023 1,990,453Million Won▲ +278.2%
Boring & grouting works Value of construction completed in original contract
2008 124,136Million Won→2023 120,530Million Won▼ −2.9%
Interior architecture works Value of construction completed in original contract
2008 3,568,872Million Won→2023 7,103,938Million Won▲ +99.1%
Metal structure installation and Erection of doors and Greenhouse construction Value of construction completed in original contract
2008 1,326,343Million Won→2023 2,508,008Million Won▲ +89.1%
Roofing sheet metal prefabrication Value of construction completed in original contract
2008 102,064Million Won→2023 232,822Million Won▲ +128.1%
Painting works Value of construction completed in original contract
2008 465,381Million Won→2023 1,297,757Million Won▲ +178.9%
Plastering waterproofing construction business Value of construction completed in original contract
2008 435,015Million Won→2023 953,667Million Won▲ +119.2%
Stone works Value of construction completed in original contract
2008 325,235Million Won→2023 507,473Million Won▲ +56.0%
Landscape Planting Works Value of construction completed in original contract
2008 640,987Million Won→2023 1,529,872Million Won▲ +138.7%
Landscape Works Facility Value of construction completed in original contract
2008 280,965Million Won→2023 932,668Million Won▲ +232.0%
Steel Reinforcing and Reinforced Concrete Works Value of construction completed in original contract
2008 1,715,947Million Won→2023 2,035,618Million Won▲ +18.6%
Scaffolding demolition works Value of construction completed in original contract
2008 380,048Million Won→2023 985,467Million Won▲ +159.3%
Total Value of construction completed in subcontract
2008 65,984,431Million Won→2023 123,676,377Million Won▲ +87.4%
General construction Value of construction completed in subcontract
2008 2,837,907Million Won→2023 5,634,433Million Won▲ +98.5%
Special construction Value of construction completed in subcontract
2008 56,794,555Million Won→2023 99,680,497Million Won▲ +75.5%
Excavating and earthmoving Value of construction completed in subcontract
2008 10,302,829Million Won→2023 13,748,928Million Won▲ +33.4%
Pavement Value of construction completed in subcontract
2008 787,230Million Won→2023 807,953Million Won▲ +2.6%
Boring & grouting works Value of construction completed in subcontract
2008 762,244Million Won→2023 1,963,940Million Won▲ +157.7%
Interior architecture works Value of construction completed in subcontract
2008 4,158,056Million Won→2023 8,265,699Million Won▲ +98.8%
Metal structure installation and Erection of doors and Greenhouse construction Value of construction completed in subcontract
2008 5,141,865Million Won→2023 8,951,177Million Won▲ +74.1%
Roofing sheet metal prefabrication Value of construction completed in subcontract
2008 1,073,833Million Won→2023 3,003,578Million Won▲ +179.7%
Painting works Value of construction completed in subcontract
2008 854,274Million Won→2023 1,559,524Million Won▲ +82.6%
Plastering waterproofing construction business Value of construction completed in subcontract
2008 2,387,681Million Won→2023 5,196,514Million Won▲ +117.6%
Stone works Value of construction completed in subcontract
2008 1,611,470Million Won→2023 2,106,445Million Won▲ +30.7%
Landscape Planting Works Value of construction completed in subcontract
2008 1,450,917Million Won→2023 1,443,110Million Won▼ −0.5%
Landscape Works Facility Value of construction completed in subcontract
2008 1,059,981Million Won→2023 1,110,832Million Won▲ +4.8%
Steel Reinforcing and Reinforced Concrete Works Value of construction completed in subcontract
2008 11,370,151Million Won→2023 24,889,564Million Won▲ +118.9%
Scaffolding demolition works Value of construction completed in subcontract
2008 1,160,150Million Won→2023 1,862,380Million Won▲ +60.5%
Total Value of carry-over work
2008 422,303,556Million Won→2023 779,614,693Million Won▲ +84.6%
General construction Value of carry-over work
2008 359,443,410Million Won→2023 648,985,232Million Won▲ +80.6%
Special construction Value of carry-over work
2008 43,454,611Million Won→2023 84,836,561Million Won▲ +95.2%
Excavating and earthmoving Value of carry-over work
2008 10,261,277Million Won→2023 14,067,591Million Won▲ +37.1%
Pavement Value of carry-over work
2008 777,124Million Won→2023 880,236Million Won▲ +13.3%
Boring & grouting works Value of carry-over work
2008 577,445Million Won→2023 1,501,730Million Won▲ +160.1%
Interior architecture works Value of carry-over work
2008 2,754,321Million Won→2023 5,596,268Million Won▲ +103.2%
Metal structure installation and Erection of doors and Greenhouse construction Value of carry-over work
2008 2,983,405Million Won→2023 6,114,929Million Won▲ +105.0%
Roofing sheet metal prefabrication Value of carry-over work
2008 285,297Million Won→2023 1,556,261Million Won▲ +445.5%
Painting works Value of carry-over work
2008 435,954Million Won→2023 956,623Million Won▲ +119.4%
Plastering waterproofing construction business Value of carry-over work
2008 1,710,516Million Won→2023 3,926,420Million Won▲ +129.5%
Stone works Value of carry-over work
2008 722,936Million Won→2023 1,068,937Million Won▲ +47.9%
Landscape Planting Works Value of carry-over work
2008 947,693Million Won→2023 852,761Million Won▼ −10.0%
Landscape Works Facility Value of carry-over work
2008 561,266Million Won→2023 569,802Million Won▲ +1.5%
Steel Reinforcing and Reinforced Concrete Works Value of carry-over work
2008 8,803,255Million Won→2023 19,957,297Million Won▲ +126.7%
Scaffolding demolition works Value of carry-over work
2008 1,039,498Million Won→2023 1,875,444Million Won▲ +80.4%
Data source
- Organization
- 통계청
- Dataset
- 산업세분류 및 조직형태별 총괄
- Provider
- KOSIS 국가통계포털
- Period
- 2008 ~ 2023
- As of
- 2026-08-29
- Processing
- KOSIS OpenAPI 로 연간 전국값을 받아 그대로 사용. 가공 없음.
Other surveys in this category
- Construction Industry Survey1 tables · 102 items
- Construction Business Trend Survey13 tables · 159 items
- Building Permit, Start and Completion Statistics4 tables · 26 items
- Building Statistics1 tables · 113 items
- Urban Redevelopment Project Status5 tables · 26 items
- Overseas Construction Orders Statistics3 tables · 78 items