Construction Industry Survey (20/49)
1 tables and 138 items from the KOSIS survey “Construction Industry Survey”, as annual figures and charts.
산업세분류별/종사자규모별 공사비용
Back to top산업별 건설업 · 종사자규모별 계
- Construction Total
- General construction Total
- Building construction Total
- Residential building construction Total
- Non-residential building construction Total
- Heavy and civil engineering construction Total
- Land subdivision with land improvement Total
- Construction of civil engineering projects Total
- Specialized construction activities Total
- Site preparation and construction of foundation works and structures Total
- Site preparation and related construction Total
- Erecting assembling and framing structural parts and masonry works Total
- Construction of installing building equipment Total
- Construction of installing building equipment Total
- Electrical and communication works Total
- Electrical works Total
- Communication works Total
- Building completion and finishing Total
- Painting papering and finishing carpentry works Total
- Glazing works and joinery installation Total
- Other building completion and finishing Total
- Repair and maintenance works for construction works and supplementary facilities Total
- Repair and maintenance works for construction works and supplementary facilities Total
- Construction Raw material costs
- General construction Raw material costs
- Building construction Raw material costs
- Residential building construction Raw material costs
- Non-residential building construction Raw material costs
- Heavy and civil engineering construction Raw material costs
- Land subdivision with land improvement Raw material costs
- Construction of civil engineering projects Raw material costs
- Specialized construction activities Raw material costs
- Site preparation and construction of foundation works and structures Raw material costs
- Site preparation and related construction Raw material costs
- Erecting assembling and framing structural parts and masonry works Raw material costs
- Construction of installing building equipment Raw material costs
- Construction of installing building equipment Raw material costs
- Electrical and communication works Raw material costs
- Electrical works Raw material costs
- Communication works Raw material costs
- Building completion and finishing Raw material costs
- Painting papering and finishing carpentry works Raw material costs
- Glazing works and joinery installation Raw material costs
- Other building completion and finishing Raw material costs
- Repair and maintenance works for construction works and supplementary facilities Raw material costs
- Repair and maintenance works for construction works and supplementary facilities Raw material costs
- Construction Ancillary material costs
- General construction Ancillary material costs
- Building construction Ancillary material costs
- Residential building construction Ancillary material costs
- Non-residential building construction Ancillary material costs
- Heavy and civil engineering construction Ancillary material costs
- Land subdivision with land improvement Ancillary material costs
- Construction of civil engineering projects Ancillary material costs
- Specialized construction activities Ancillary material costs
- Site preparation and construction of foundation works and structures Ancillary material costs
- Site preparation and related construction Ancillary material costs
- Erecting assembling and framing structural parts and masonry works Ancillary material costs
- Construction of installing building equipment Ancillary material costs
- Construction of installing building equipment Ancillary material costs
- Electrical and communication works Ancillary material costs
- Electrical works Ancillary material costs
- Communication works Ancillary material costs
- Building completion and finishing Ancillary material costs
- Painting papering and finishing carpentry works Ancillary material costs
- Glazing works and joinery installation Ancillary material costs
- Other building completion and finishing Ancillary material costs
- Repair and maintenance works for construction works and supplementary facilities Ancillary material costs
- Repair and maintenance works for construction works and supplementary facilities Ancillary material costs
- Construction Labour cost
- General construction Labour cost
- Building construction Labour cost
- Residential building construction Labour cost
- Non-residential building construction Labour cost
- Heavy and civil engineering construction Labour cost
- Land subdivision with land improvement Labour cost
- Construction of civil engineering projects Labour cost
- Specialized construction activities Labour cost
- Site preparation and construction of foundation works and structures Labour cost
- Site preparation and related construction Labour cost
- Erecting assembling and framing structural parts and masonry works Labour cost
- Construction of installing building equipment Labour cost
- Construction of installing building equipment Labour cost
- Electrical and communication works Labour cost
- Electrical works Labour cost
- Communication works Labour cost
- Building completion and finishing Labour cost
- Painting papering and finishing carpentry works Labour cost
- Glazing works and joinery installation Labour cost
- Other building completion and finishing Labour cost
- Repair and maintenance works for construction works and supplementary facilities Labour cost
- Repair and maintenance works for construction works and supplementary facilities Labour cost
- Construction Cost for welfare work
- General construction Cost for welfare work
- Building construction Cost for welfare work
- Residential building construction Cost for welfare work
- Non-residential building construction Cost for welfare work
- Heavy and civil engineering construction Cost for welfare work
- Land subdivision with land improvement Cost for welfare work
- Construction of civil engineering projects Cost for welfare work
- Specialized construction activities Cost for welfare work
- Site preparation and construction of foundation works and structures Cost for welfare work
- Site preparation and related construction Cost for welfare work
- Erecting assembling and framing structural parts and masonry works Cost for welfare work
- Construction of installing building equipment Cost for welfare work
- Construction of installing building equipment Cost for welfare work
- Electrical and communication works Cost for welfare work
- Electrical works Cost for welfare work
- Communication works Cost for welfare work
- Building completion and finishing Cost for welfare work
- Painting papering and finishing carpentry works Cost for welfare work
- Glazing works and joinery installation Cost for welfare work
- Other building completion and finishing Cost for welfare work
- Repair and maintenance works for construction works and supplementary facilities Cost for welfare work
- Repair and maintenance works for construction works and supplementary facilities Cost for welfare work
- Construction Depreciation
- General construction Depreciation
- Building construction Depreciation
- Residential building construction Depreciation
- Non-residential building construction Depreciation
- Heavy and civil engineering construction Depreciation
- Land subdivision with land improvement Depreciation
- Construction of civil engineering projects Depreciation
- Specialized construction activities Depreciation
- Site preparation and construction of foundation works and structures Depreciation
- Site preparation and related construction Depreciation
- Erecting assembling and framing structural parts and masonry works Depreciation
- Construction of installing building equipment Depreciation
- Construction of installing building equipment Depreciation
- Electrical and communication works Depreciation
- Electrical works Depreciation
- Communication works Depreciation
- Building completion and finishing Depreciation
- Painting papering and finishing carpentry works Depreciation
- Glazing works and joinery installation Depreciation
- Other building completion and finishing Depreciation
- Repair and maintenance works for construction works and supplementary facilities Depreciation
- Repair and maintenance works for construction works and supplementary facilities Depreciation
Construction Total
2008 253,551,646million won→2023 490,507,458million won▲ +93.5%
General construction Total
2008 157,802,056million won→2023 318,548,351million won▲ +101.9%
Building construction Total
2008 118,103,162million won→2023 267,620,938million won▲ +126.6%
Residential building construction Total
2008 75,143,154million won→2023 140,216,525million won▲ +86.6%
Non-residential building construction Total
2008 42,960,007million won→2023 127,404,413million won▲ +196.6%
Heavy and civil engineering construction Total
2008 39,698,894million won→2023 50,927,413million won▲ +28.3%
Land subdivision with land improvement Total
2008 1,942,999million won→2023 1,086,744million won▼ −44.1%
Construction of civil engineering projects Total
2008 37,755,894million won→2023 49,840,669million won▲ +32.0%
Specialized construction activities Total
2008 95,749,590million won→2023 171,959,107million won▲ +79.6%
Site preparation and construction of foundation works and structures Total
2008 39,706,230million won→2023 62,981,340million won▲ +58.6%
Site preparation and related construction Total
2008 12,402,025million won→2023 15,454,885million won▲ +24.6%
Erecting assembling and framing structural parts and masonry works Total
2008 27,304,204million won→2023 47,526,455million won▲ +74.1%
Construction of installing building equipment Total
2008 14,620,589million won→2023 30,028,179million won▲ +105.4%
Construction of installing building equipment Total
2008 14,620,589million won→2023 30,028,179million won▲ +105.4%
Electrical and communication works Total
2008 19,109,923million won→2023 43,345,861million won▲ +126.8%
Electrical works Total
2008 12,899,527million won→2023 30,966,701million won▲ +140.1%
Communication works Total
2008 6,210,396million won→2023 12,379,160million won▲ +99.3%
Building completion and finishing Total
2008 21,103,322million won→2023 35,603,727million won▲ +68.7%
Painting papering and finishing carpentry works Total
2008 10,059,274million won→2023 16,975,257million won▲ +68.8%
Glazing works and joinery installation Total
2008 8,060,244million won→2023 12,734,200million won▲ +58.0%
Other building completion and finishing Total
2008 2,983,804million won→2023 5,894,270million won▲ +97.5%
Repair and maintenance works for construction works and supplementary facilities Total
2008 1,209,524million won→2022 1,070,266million won▼ −11.5%
Repair and maintenance works for construction works and supplementary facilities Total
2008 1,209,524million won→2022 1,070,266million won▼ −11.5%
Construction Raw material costs
2008 79,819,733million won→2023 135,917,378million won▲ +70.3%
General construction Raw material costs
2008 45,219,160million won→2023 77,423,647million won▲ +71.2%
Building construction Raw material costs
2008 31,505,565million won→2023 66,702,624million won▲ +111.7%
Residential building construction Raw material costs
2008 20,140,020million won→2023 35,281,356million won▲ +75.2%
Non-residential building construction Raw material costs
2008 11,365,544million won→2023 31,421,268million won▲ +176.5%
Heavy and civil engineering construction Raw material costs
2008 13,713,595million won→2023 10,721,023million won▼ −21.8%
Land subdivision with land improvement Raw material costs
2008 415,602million won→2023 217,479million won▼ −47.7%
Construction of civil engineering projects Raw material costs
2008 13,297,992million won→2023 10,503,544million won▼ −21.0%
Specialized construction activities Raw material costs
2008 34,600,572million won→2023 58,493,732million won▲ +69.1%
Site preparation and construction of foundation works and structures Raw material costs
2008 12,290,387million won→2023 15,995,249million won▲ +30.1%
Site preparation and related construction Raw material costs
2008 3,033,953million won→2023 3,287,840million won▲ +8.4%
Erecting assembling and framing structural parts and masonry works Raw material costs
2008 9,256,434million won→2023 12,707,409million won▲ +37.3%
Construction of installing building equipment Raw material costs
2008 5,941,678million won→2023 11,585,110million won▲ +95.0%
Construction of installing building equipment Raw material costs
2008 5,941,678million won→2023 11,585,110million won▲ +95.0%
Electrical and communication works Raw material costs
2008 7,371,987million won→2023 16,279,157million won▲ +120.8%
Electrical works Raw material costs
2008 5,408,187million won→2023 11,561,050million won▲ +113.8%
Communication works Raw material costs
2008 1,963,800million won→2023 4,718,108million won▲ +140.3%
Building completion and finishing Raw material costs
2008 8,582,289million won→2023 14,634,215million won▲ +70.5%
Painting papering and finishing carpentry works Raw material costs
2008 3,908,432million won→2023 6,539,402million won▲ +67.3%
Glazing works and joinery installation Raw material costs
2008 3,624,667million won→2023 6,160,333million won▲ +70.0%
Other building completion and finishing Raw material costs
2008 1,049,188million won→2023 1,934,480million won▲ +84.4%
Repair and maintenance works for construction works and supplementary facilities Raw material costs
2008 414,229million won→2022 422,043million won▲ +1.9%
Repair and maintenance works for construction works and supplementary facilities Raw material costs
2008 414,229million won→2022 422,043million won▲ +1.9%
Construction Ancillary material costs
2008 2,475,577million won→2023 4,962,917million won▲ +100.5%
General construction Ancillary material costs
2008 850,755million won→2023 1,912,424million won▲ +124.8%
Building construction Ancillary material costs
2008 582,660million won→2023 1,475,797million won▲ +153.3%
Residential building construction Ancillary material costs
2008 238,974million won→2023 477,802million won▲ +99.9%
Non-residential building construction Ancillary material costs
2008 343,686million won→2023 997,994million won▲ +190.4%
Heavy and civil engineering construction Ancillary material costs
2008 268,094million won→2023 436,628million won▲ +62.9%
Land subdivision with land improvement Ancillary material costs
2008 16,626million won→2023 10,528million won▼ −36.7%
Construction of civil engineering projects Ancillary material costs
2008 251,468million won→2023 426,100million won▲ +69.4%
Specialized construction activities Ancillary material costs
2008 1,624,822million won→2023 3,050,492million won▲ +87.7%
Site preparation and construction of foundation works and structures Ancillary material costs
2008 745,713million won→2023 1,357,345million won▲ +82.0%
Site preparation and related construction Ancillary material costs
2008 254,449million won→2023 412,322million won▲ +62.0%
Erecting assembling and framing structural parts and masonry works Ancillary material costs
2008 491,263million won→2023 945,023million won▲ +92.4%
Construction of installing building equipment Ancillary material costs
2008 222,853million won→2023 486,523million won▲ +118.3%
Construction of installing building equipment Ancillary material costs
2008 222,853million won→2023 486,523million won▲ +118.3%
Electrical and communication works Ancillary material costs
2008 340,344million won→2023 631,386million won▲ +85.5%
Electrical works Ancillary material costs
2008 235,298million won→2023 454,831million won▲ +93.3%
Communication works Ancillary material costs
2008 105,045million won→2023 176,555million won▲ +68.1%
Building completion and finishing Ancillary material costs
2008 292,219million won→2023 575,239million won▲ +96.9%
Painting papering and finishing carpentry works Ancillary material costs
2008 120,101million won→2023 266,161million won▲ +121.6%
Glazing works and joinery installation Ancillary material costs
2008 128,232million won→2023 212,989million won▲ +66.1%
Other building completion and finishing Ancillary material costs
2008 43,885million won→2023 96,089million won▲ +119.0%
Repair and maintenance works for construction works and supplementary facilities Ancillary material costs
2008 23,692million won→2022 21,102million won▼ −10.9%
Repair and maintenance works for construction works and supplementary facilities Ancillary material costs
2008 23,692million won→2022 21,102million won▼ −10.9%
Construction Labour cost
2008 39,837,194million won→2023 88,733,469million won▲ +122.7%
General construction Labour cost
2008 15,876,193million won→2023 37,045,413million won▲ +133.3%
Building construction Labour cost
2008 12,025,540million won→2023 28,062,577million won▲ +133.4%
Residential building construction Labour cost
2008 7,373,534million won→2023 11,256,905million won▲ +52.7%
Non-residential building construction Labour cost
2008 4,652,006million won→2023 16,805,673million won▲ +261.3%
Heavy and civil engineering construction Labour cost
2008 3,850,653million won→2023 8,982,836million won▲ +133.3%
Land subdivision with land improvement Labour cost
2008 244,145million won→2023 207,253million won▼ −15.1%
Construction of civil engineering projects Labour cost
2008 3,606,507million won→2023 8,775,582million won▲ +143.3%
Specialized construction activities Labour cost
2008 23,961,001million won→2023 51,688,056million won▲ +115.7%
Site preparation and construction of foundation works and structures Labour cost
2008 9,403,971million won→2023 20,812,307million won▲ +121.3%
Site preparation and related construction Labour cost
2008 2,437,987million won→2023 3,679,069million won▲ +50.9%
Erecting assembling and framing structural parts and masonry works Labour cost
2008 6,965,983million won→2023 17,133,238million won▲ +146.0%
Construction of installing building equipment Labour cost
2008 3,607,731million won→2023 9,240,280million won▲ +156.1%
Construction of installing building equipment Labour cost
2008 3,607,731million won→2023 9,240,280million won▲ +156.1%
Electrical and communication works Labour cost
2008 5,747,962million won→2023 12,319,822million won▲ +114.3%
Electrical works Labour cost
2008 4,029,607million won→2023 9,378,377million won▲ +132.7%
Communication works Labour cost
2008 1,718,354million won→2023 2,941,444million won▲ +71.2%
Building completion and finishing Labour cost
2008 4,875,126million won→2023 9,315,647million won▲ +91.1%
Painting papering and finishing carpentry works Labour cost
2008 2,246,729million won→2023 4,535,486million won▲ +101.9%
Glazing works and joinery installation Labour cost
2008 1,641,448million won→2023 2,715,866million won▲ +65.5%
Other building completion and finishing Labour cost
2008 986,948million won→2023 2,064,296million won▲ +109.2%
Repair and maintenance works for construction works and supplementary facilities Labour cost
2008 326,209million won→2022 263,617million won▼ −19.2%
Repair and maintenance works for construction works and supplementary facilities Labour cost
2008 326,209million won→2022 263,617million won▼ −19.2%
Construction Cost for welfare work
2008 5,110,268million won→2023 14,737,420million won▲ +188.4%
General construction Cost for welfare work
2008 2,317,624million won→2023 7,995,753million won▲ +245.0%
Building construction Cost for welfare work
2008 1,661,635million won→2023 6,432,547million won▲ +287.1%
Residential building construction Cost for welfare work
2008 990,232million won→2023 3,068,287million won▲ +209.9%
Non-residential building construction Cost for welfare work
2008 671,402million won→2023 3,364,260million won▲ +401.1%
Heavy and civil engineering construction Cost for welfare work
2008 655,988million won→2023 1,563,206million won▲ +138.3%
Land subdivision with land improvement Cost for welfare work
2008 36,444million won→2023 36,149million won▼ −0.8%
Construction of civil engineering projects Cost for welfare work
2008 619,544million won→2023 1,527,057million won▲ +146.5%
Specialized construction activities Cost for welfare work
2008 2,792,644million won→2023 6,741,667million won▲ +141.4%
Site preparation and construction of foundation works and structures Cost for welfare work
2008 1,211,769million won→2023 2,613,545million won▲ +115.7%
Site preparation and related construction Cost for welfare work
2008 375,160million won→2023 567,737million won▲ +51.3%
Erecting assembling and framing structural parts and masonry works Cost for welfare work
2008 836,609million won→2023 2,045,807million won▲ +144.5%
Construction of installing building equipment Cost for welfare work
2008 390,471million won→2023 1,242,443million won▲ +218.2%
Construction of installing building equipment Cost for welfare work
2008 390,471million won→2023 1,242,443million won▲ +218.2%
Electrical and communication works Cost for welfare work
2008 630,578million won→2023 1,758,953million won▲ +178.9%
Electrical works Cost for welfare work
2008 450,316million won→2023 1,348,679million won▲ +199.5%
Communication works Cost for welfare work
2008 180,262million won→2023 410,274million won▲ +127.6%
Building completion and finishing Cost for welfare work
2008 528,177million won→2023 1,126,726million won▲ +113.3%
Painting papering and finishing carpentry works Cost for welfare work
2008 240,940million won→2023 546,291million won▲ +126.7%
Glazing works and joinery installation Cost for welfare work
2008 186,584million won→2023 354,427million won▲ +90.0%
Other building completion and finishing Cost for welfare work
2008 100,652million won→2023 226,008million won▲ +124.5%
Repair and maintenance works for construction works and supplementary facilities Cost for welfare work
2008 31,647million won→2022 36,643million won▲ +15.8%
Repair and maintenance works for construction works and supplementary facilities Cost for welfare work
2008 31,647million won→2022 36,643million won▲ +15.8%
Construction Depreciation
2008 1,495,776million won→2023 3,450,554million won▲ +130.7%
General construction Depreciation
2008 618,770million won→2023 1,790,596million won▲ +189.4%
Building construction Depreciation
2008 337,568million won→2023 1,420,527million won▲ +320.8%
Residential building construction Depreciation
2008 161,132million won→2023 719,478million won▲ +346.5%
Non-residential building construction Depreciation
2008 176,435million won→2023 701,049million won▲ +297.3%
Heavy and civil engineering construction Depreciation
2008 281,202million won→2023 370,069million won▲ +31.6%
Land subdivision with land improvement Depreciation
2008 8,690million won→2023 7,050million won▼ −18.9%
Construction of civil engineering projects Depreciation
2008 272,511million won→2023 363,019million won▲ +33.2%
Specialized construction activities Depreciation
2008 877,006million won→2023 1,659,958million won▲ +89.3%
Site preparation and construction of foundation works and structures Depreciation
2008 374,719million won→2023 581,128million won▲ +55.1%
Site preparation and related construction Depreciation
2008 120,124million won→2023 159,597million won▲ +32.9%
Erecting assembling and framing structural parts and masonry works Depreciation
2008 254,595million won→2023 421,531million won▲ +65.6%
Construction of installing building equipment Depreciation
2008 107,549million won→2023 254,904million won▲ +137.0%
Construction of installing building equipment Depreciation
2008 107,549million won→2023 254,904million won▲ +137.0%
Electrical and communication works Depreciation
2008 240,271million won→2023 563,599million won▲ +134.6%
Electrical works Depreciation
2008 132,311million won→2023 386,403million won▲ +192.0%
Communication works Depreciation
2008 107,960million won→2023 177,196million won▲ +64.1%
Building completion and finishing Depreciation
2008 146,570million won→2023 260,326million won▲ +77.6%
Painting papering and finishing carpentry works Depreciation
2008 63,423million won→2023 108,485million won▲ +71.0%
Glazing works and joinery installation Depreciation
2008 63,366million won→2023 116,076million won▲ +83.2%
Other building completion and finishing Depreciation
2008 19,780million won→2023 35,765million won▲ +80.8%
Repair and maintenance works for construction works and supplementary facilities Depreciation
2008 7,894million won→2022 9,681million won▲ +22.6%
Repair and maintenance works for construction works and supplementary facilities Depreciation
2008 7,894million won→2022 9,681million won▲ +22.6%
Data source
- Organization
- 통계청
- Dataset
- 산업세분류 및 조직형태별 총괄
- Provider
- KOSIS 국가통계포털
- Period
- 2008 ~ 2023
- As of
- 2026-08-29
- Processing
- KOSIS OpenAPI 로 연간 전국값을 받아 그대로 사용. 가공 없음.
Other surveys in this category
- Construction Industry Survey1 tables · 102 items
- Construction Business Trend Survey13 tables · 159 items
- Building Permit, Start and Completion Statistics4 tables · 26 items
- Building Statistics1 tables · 113 items
- Urban Redevelopment Project Status5 tables · 26 items
- Overseas Construction Orders Statistics3 tables · 78 items